PureAir PCO14-23 Installation Instructions Manual

Air purification system photocatalytic oxidation (pco) technology

Advertisement

505,276M
7/2014
Supersedes 2/2012
INSTALLATION INSTRUCTIONS FOR PUREAIR™ AIR PURIFICATION SYSTEM
RETAIN THESE INSTRUCTIONS
FOR FUTURE REFERENCE
Shipping & Packing List
Assembled PureAir™ air purification system which
includes:
1 - Cabinet
1 - Control box assembly (includes frame, ballasts
and associated wiring)
1 - MERV 16 pleated filter
2 - UVA lamps (taped to the cabinet and the insert foil
packaging)
1 - Titanium dioxide PureAir™ Insert
1 - Power cord (120VAC)*
*230VAC power cord available separately (part number
91X44).
A warranty certificate and registration card are also
included.
Shipping Damage
Check equipment for shipping damage. If damage is
found, immediately contact last carrier.
General Information
The PureAir™ air purification system uses photocatalytic
oxidation (PCO) technology to significantly reduce levels
of airborne volatile organic compounds, cooking odors,
common household odors, airborne dust particles, mold
spores and pollen. The PureAir™ system is available in
three models: PCO14-23, PCO16-28 and PCO20-28.
Each unit may be connected to either 120VAC or 230VAC
power supply. If 230VAC power supply is used, a 230VAC
power cord must be ordered separately.
Lab tests confirm a 50% reduction in total volatile organic
compounds (TVOC) within the first 24 hours of initial
operation of the PureAir™ air purification system. It may
take up to 48 hours after initial system start-up to reduce
the airborne chemicals that have built up in a home over a
long period of time.
For peak performance, unit should be installed in homes
with TVOC levels that are less than 1000 micro-gram /
cubic meter. Home source removal and ventilation may be
required to lower TVOCs to this level.
AIR CLEANERS / FILTERS
PHOTOCATALYTIC OXIDATION (PCO) TECHNOLOGY
MODELS PCO14-23, PCO16-28 AND PCO20-28
Page 1
PUREAIR™ AIR PURIFICATION SYSTEM
NOTICE
This system is NOT intended to be used for removal
of active mold growth or continuous sources of
high levels of chemicals in the air.
For existing mold growth, the mold must be proper­
ly removed PRIOR to installation of the PureAir™ air
purification system.
WARNING
Risk of property damage, injury, or death.
Installation and service must be performed by a
qualified installer or service agency.
WARNING
Electric shock hazard.
Can cause injury or death.
Disconnect all electrical power supplies before ser­
vicing. Access panels must be in place during ap­
pliance operation.
Sharp edges hazard.
Sharp edges can cause injuries.
Use protective gloves when grasping equipment
edges.
NOTICE
Possible odor emissions. Chemical reactions may
cause temporary odors after initial start-up or after
lamp replacement. Odor may also be present after
paint, cleaning solutions or hobby materials have
been used in the conditioned space.
Some occupants may experience irritation or dis­
comfort during this period. If the irritation or dis­
comfort lasts longer than 48 hours, the homeowner
should be advised to contact a Lennox dealer.
Unique Field-Supplied Installation Items
Cotton gloves and cloth (to remove finger prints from
lamps)
Aluminum foil tape or water-based mastic (NOT
silicone) to be applied as a sealant.
CAUTION
Litho U.S.A.

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the PCO14-23 and is the answer not in the manual?

Questions and answers

Summary of Contents for PureAir PCO14-23

  • Page 1 Assembled PureAir™ air purification system which For existing mold growth, the mold must be proper­ includes: ly removed PRIOR to installation of the PureAir™ air 1 - Cabinet purification system. 1 - Control box assembly (includes frame, ballasts...
  • Page 2: Parts Identification

    MERV 16 Filter Control Box Lamp Assembly Securing Clip Electrical Socket Ballast Access Door Cabinet PureAir™ Insert Reflectors UVA Lamps (Not Installed) Lamp Socket Surge Protector Box Cover Figure 1. PCO Parts Identification Installation Examples Note - At sharp turns, install turn­...
  • Page 3: Installation

    Allow a 30-inch service clearance in ELECTRICAL front of the access door as shown in figure 4. The control PCO14-23 120V, 50/60 Hz, box, pleated filter and PureAir™ Insert must be removable. 1.2 Amps -- Maximum, PCO16-28 230 V, 50/60 Hz, PCO20-28 0.65 Amps -- Maximum...
  • Page 4 Carefully remove insert from packaging. Use a mild soap and water solution to remove oils 10. Keep PureAir™ Insert and filter in a safe place to from transitions and duct surfaces prior to installa­ ensure these components remain clean until the tion.
  • Page 5 The PCO shall be wired in accordance with national and of the PCO cabinet. Verify proper air flow direction. local codes. 2. Slide the PureAir™ Insert into rails on the air outlet side of the PCO cabinet. Slide the control box NOTICE assembly back into the cabinet.
  • Page 6: Operation

    Filter, Insert and Lamp Replacement 10. Gently pull on lamp to ensure that lamp securing clip is engaged. The PCO MERV 16 filter, PureAir™ Insert and UVA lamps 11. Repeat steps 8 and 9 to replace second lamp. require annual replacement. More frequent replacement 12.
  • Page 7: Troubleshooting Flow Chart

    X8799 X8799 X8799 The Annual Maintenance Kits include one MERV 16 filter, *Ballast X8798 X8798 X8798 one PureAir™ Insert and two lamps. Kit part numbers are *Surge Protector X8928 X8928 X8928 as follows: PUREAIR™ AIR PURIFICATION SYSTEM Page 7 PHOTOCATALYTIC OXIDATION (PCO) TECHNOLOGY...
  • Page 8 START Look through access panel viewing port to check lamps. lamps lit? Check power supply (breakers, plug, there power to electrical wiring). Repair electrical PCO? problem and plug in power cord. lamps lit? Gently pull on lamp to make sure the lamps are in place. Continue with maintenance...

This manual is also suitable for:

Pco16-28Pco20-28

Table of Contents