Section 1: Installation Basics; System Preparation And Configuration; Unpacking; Before Installing - NEC DS1000 Operation Manual

Hide thumbs Also See for DS1000:
Table of Contents

Advertisement

System Preparation and Configuration
System Preparation and Configuration

Unpacking

Unpack the equipment and check it against your equipment lists. Inspect for physical damage. If you are not
sure about a component's function, review the Product Description Manual. Contact your Sales Representa-
tive if you have additional questions. Have the appropriate tools for the job on hand, including: a test set, a
punch down tool and a digital voltmeter.

Before Installing

Make sure you have a building plan showing the location of the common equipment, extensions, the telco
demarcation and earth ground. In addition, the installation site must meet the requirements outlined in the
Standard Practices Manual.

Site Requirements

The common equipment is contained in the wall-mounted Main Equipment Cabinet. Choose a central location
for the cabinet that allows enough space for the equipment — and provides enough room for you to comfortably
work. Figure 1-1 Installation Layout on page 1-5 shows you about how much space your system requires.
System Configuration
Using the factory installed default configuration, your DS1000 system provides:
Turn to Installing the Expansion Board on page 1-10 for more on installing the Expansion PCB.
DS1000 Hardware Manual
System Preparation and Configuration
Section 1: Installation
Trunks
Digital Extensions
Analog Extensions
Analog Door Boxes
Relays
Page Output
Music Input
Base
Expansion
3
3
8
8
4
4
1
1
1
1
1
-
1
-
Section 1: Installation Basics ◆ 1-1
Basics
Total
6
16
8
2
2
1
1
1

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ds2000

Table of Contents