Download Print this page
Champion Pump CPG 2HP Grinder Series Installation Manual

Champion Pump CPG 2HP Grinder Series Installation Manual

Submersible grinder pump

Advertisement

Quick Links

Advertisement

loading
Need help?

Need help?

Do you have a question about the CPG 2HP Grinder Series and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Champion Pump CPG 2HP Grinder Series

  • Page 3: Warranty

    USER GUIDE Congratulations on your purchase of a Champion Pump grinder pump system. With proper care and by following a few simple guidelines, your grinder pump will give you many years of dependable service. USE & CARE The Champion grinder pump station is designed to handle routine, domestic sewage. Solid waste materials should be thrown in the trash.
  • Page 4: Installation

    USER GUIDE INSTALLATION The pump is provided with a leg kit in case a rail lift out system is not used. A minimum of 3” clearance must be maintained between the pump and the basin bottom. If the feet are to be used, install the rubber threaded feet and lock with nut to ensure 3”...
  • Page 5 USER GUIDE SERVICE Lubrication: Anytime the pump is removed from operation, the cooling oil in the motor housing should be checked visually for oil level and contamination. Checking Oil: To check oil in the motor housing, set pump upright. Remove plug from motor housing. With a flashlight, visually inspect the oil in the motor housing to make sure it is clean and clear, light amber in color and free from suspended particles.
  • Page 6 NOTE: CPG2022DSL MODELS MUST HAVE CAPACITOR KIT # 28-0009-0000 OR WARRANTY IS VOID...
  • Page 9: Specifications

    Specifications SHAFT SEAL - (SINGLE SEAL) DISCHARGE………………………..1-1/4" NPT. Vertical Silicon Carbide-Silicon Carbide SOLIDS HANDLING……………………………………3” Buna-N- Elastomer LIQUID TEMP……..……150 DEG. F. INTERMITTENT 300 Series Stainless Steel - Hardware MOTOR HOUSING…………………………….Cast Iron SHAFT SEAL - (DOUBLE SEAL) VOLUTE…………………………………………Cast Iron Tandem Double Mechanical SEAL PLATE……………………………………Cast Iron Upper / Carbon-Ceramic Lower/ Silicon Carbide-Silicon Carbide...
  • Page 11 Start-Up Report / Warranty Registration Please fill out the following questions as completely and accurate as possible. Please mail to Champion Pump Company, Inc. – P. O. Box 528 – Ashland, OH 44805. REPORTS THAT ARE NOT RETURNED CAN DELAY OR VOID WARRANTY.