CS-V9BK PG CU-2 V14B KP5G / CS-V9BKP G CU-2 V18B KP5G / CS-V9BKP G CU-3 V20B KP5G / CS-V7BKP G CU-2 V19B KP5G / CS-V12B KPG 2 Functions Remote Control Self illuminating button OFF / ON I TEMP. Operation OFF / ON Room Temperature Setting Cooling, Soft Dry, Air Circulation Operation.
Page 4
CS-V9BK PG CU-2 V14B KP5G / CS-V9BKP G CU-2 V18B KP5G / CS-V9BKP G CU-3 V20B KP5G / CS-V7BKP G CU-2 V19B KP5G / CS-V12B KPG Indoor Unit AUTO OFF / ON Automatic Operation Button Random Auto Restart Control • Press for < 5s to operate Automatic •...
Page 5
CS-V9BK PG CU-2 V14B KP5G / CS-V9BKP G CU-2 V18B KP5G / CS-V9BKP G CU-3 V20B KP5G / CS-V7BKP G CU-2 V19B KP5G / CS-V12B KPG Outdoor Unit CU-2V14BK, CU-2V18BK, CU-2V19BK & CU-3V20BK Compressor Reverse Rotation Protection Control • To protect compressor from reverse rotation when there is a instantaneous power failure.
CS-V9BK PG CU-2 V14B KP5G / CS-V9BKP G CU-2 V18B KP5G / CS-V9BKP G CU-3 V20B KP5G / CS-V7BKP G CU-2 V19B KP5G / CS-V12B KPG 3 Product Specifications Unit CS-V9BKPG CU-2V14BKP5G Power Source Phase Single Cycle Cooling Capacity (1 unit) 3.00 (2 units) 3.70...
Page 7
CS-V9BK PG CU-2 V14B KP5G / CS-V9BKP G CU-2 V18B KP5G / CS-V9BKP G CU-3 V20B KP5G / CS-V7BKP G CU-2 V19B KP5G / CS-V12B KPG Air Circulation Type Cross-flow Fan Propeller Fan Material AS + Glass Fiber 20% AS + Glass Fiber 20% Motor Type Induction (4-poles)
Page 8
CS-V9BK PG CU-2 V14B KP5G / CS-V9BKP G CU-2 V18B KP5G / CS-V9BKP G CU-3 V20B KP5G / CS-V7BKP G CU-2 V19B KP5G / CS-V12B KPG Unit CS-V9BKPG CU-2V18BKP5G Power Source Phase Single Cycle Cooling Capacity (1 unit) 2.73 (2 units) 5.46...
Page 9
CS-V9BK PG CU-2 V14B KP5G / CS-V9BKP G CU-2 V18B KP5G / CS-V9BKP G CU-3 V20B KP5G / CS-V7BKP G CU-2 V19B KP5G / CS-V12B KPG Air Circulation Type Cross-flow Fan Propeller Fan Material AS + Glass Fiber 20% AS + Glass Fiber 20% Motor Type Induction (4-poles)
Page 10
CS-V9BK PG CU-2 V14B KP5G / CS-V9BKP G CU-2 V18B KP5G / CS-V9BKP G CU-3 V20B KP5G / CS-V7BKP G CU-2 V19B KP5G / CS-V12B KPG CS-V9BKPG CU-3V20BKP5G Unit Single Operation Single Operation Double Operation Triple (A, B1, B2) Operation...
Page 11
CS-V9BK PG CU-2 V14B KP5G / CS-V9BKP G CU-2 V18B KP5G / CS-V9BKP G CU-3 V20B KP5G / CS-V7BKP G CU-2 V19B KP5G / CS-V12B KPG Type Cross-flow Fan Propeller Fan Circulation Material AS + Glass Fiber AS + Glass Fiber 20% Motor Type Induction (4-poles)
Page 12
CS-V9BK PG CU-2 V14B KP5G / CS-V9BKP G CU-2 V18B KP5G / CS-V9BKP G CU-3 V20B KP5G / CS-V7BKP G CU-2 V19B KP5G / CS-V12B KPG One Unit (A) One Unit (B) Unit CS-V12BKPG CS-V7BKPG CU-2V19BKP5G Cooling Capacity (A) 3.55 (B) 2.10 (A+B) 5.65 kcal/h...
Page 13
CS-V9BK PG CU-2 V14B KP5G / CS-V9BKP G CU-2 V18B KP5G / CS-V9BKP G CU-3 V20B KP5G / CS-V7BKP G CU-2 V19B KP5G / CS-V12B KPG Heat Exchanger Description Evaporator Condenser Tube material Copper Copper Fin material Aluminium Aluminium Fin Type Slit Fin Louver Fin Row / Stage...
CS-V9BK PG CU-2 V14B KP5G / CS-V9BKP G CU-2 V18B KP5G / CS-V9BKP G CU-3 V20B KP5G / CS-V7BKP G CU-2 V19B KP5G / CS-V12B KPG 8 Operation Details 8.1. Cooling Mode Operation Cooling in operation according to Remote Control setting. Time Delay Safety Control (3 minutes) •...
Page 27
CS-V9BK PG CU-2 V14B KP5G / CS-V9BKP G CU-2 V18B KP5G / CS-V9BKP G CU-3 V20B KP5G / CS-V7BKP G CU-2 V19B KP5G / CS-V12B KPG Automatic Fan Speed Mode When Automatic Fan Speed is selected at Remote Control during cooling operation. •...
CS-V9BK PG CU-2 V14B KP5G / CS-V9BKP G CU-2 V18B KP5G / CS-V9BKP G CU-3 V20B KP5G / CS-V7BKP G CU-2 V19B KP5G / CS-V12B KPG 8.2. Soft Dry Mode Operation • The unit starts cooling operation until the room temperature reaches the setting temperature set on the Remote Control, and then Soft Dry operation will start.
Page 29
CS-V9BK PG CU-2 V14B KP5G / CS-V9BKP G CU-2 V18B KP5G / CS-V9BKP G CU-3 V20B KP5G / CS-V7BKP G CU-2 V19B KP5G / CS-V12B KPG Soft Dry Operation Time Diagram...
CS-V9BK PG CU-2 V14B KP5G / CS-V9BKP G CU-2 V18B KP5G / CS-V9BKP G CU-3 V20B KP5G / CS-V7BKP G CU-2 V19B KP5G / CS-V12B KPG 8.3. Air Circulation Mode Operation • When the temperature near the ceiling reaches the setting temperature, Air Circulation Mode operation commences at low airflow volume.
CS-V9BK PG CU-2 V14B KP5G / CS-V9BKP G CU-2 V18B KP5G / CS-V9BKP G CU-3 V20B KP5G / CS-V7BKP G CU-2 V19B KP5G / CS-V12B KPG 8.5. Sleep Mode Auto Operation Cooling or Soft Dry Operation Purpose is to obtain a comfortable room temperature while sleeping.
CS-V9BK PG CU-2 V14B KP5G / CS-V9BKP G CU-2 V18B KP5G / CS-V9BKP G CU-3 V20B KP5G / CS-V7BKP G CU-2 V19B KP5G / CS-V12B KPG 8.8. Random Auto Restart Control • If there is a power failure, operation will be automatically restarted after 3 to 4 minutes when the power is resumed. It will start with previous operation mode and airflow direction.
CS-V9BK PG CU-2 V14B KP5G / CS-V9BKP G CU-2 V18B KP5G / CS-V9BKP G CU-3 V20B KP5G / CS-V7BKP G CU-2 V19B KP5G / CS-V12B KPG 8.10. Vertical Airflow Direction Control Vertical Airflow Direction Auto-Control • When set a Airflow Direction Auto-Control with remote control, the louver swings up and down as shown in the diagram.
CS-V9BK PG CU-2 V14B KP5G / CS-V9BKP G CU-2 V18B KP5G / CS-V9BKP G CU-3 V20B KP5G / CS-V7BKP G CU-2 V19B KP5G / CS-V12B KPG ● How to Insert the Batteries NAME OF EACH PART ■ Remote Control 1 Signal Transmitter 2 Operation Display 3 Powerful Mode Operation Button 4 Room Temperature Setting Button...
CS-V9BK PG CU-2 V14B KP5G / CS-V9BKP G CU-2 V18B KP5G / CS-V9BKP G CU-3 V20B KP5G / CS-V7BKP G CU-2 V19B KP5G / CS-V12B KPG CARE AND MAINTENANCE ■ Cleaning the Indoor Unit and Remote ■ Pre-season Inspection ■ Air Purifying Filters Control ●...
CS-V9BK PG CU-2 V14B KP5G / CS-V9BKP G CU-2 V18B KP5G / CS-V9BKP G CU-3 V20B KP5G / CS-V7BKP G CU-2 V19B KP5G / CS-V12B KPG TROUBLESHOOTING ■ Normal Operation ■ Call the Dealer Immediately If the following conditions occur, turn off the main power Is it okay? This is the answer supply, and then call the dealer immediately.
CS-V9BK PG CU-2 V14B KP5G / CS-V9BKP G CU-2 V18B KP5G / CS-V9BKP G CU-3 V20B KP5G / CS-V7BKP G CU-2 V19B KP5G / CS-V12B KPG 10 Installation Instructions Required tools for Installation Works 1. Philips screw driver 5. Spanner 9.
Page 40
CS-V9BK PG CU-2 V14B KP5G / CS-V9BKP G CU-2 V18B KP5G / CS-V9BKP G CU-3 V20B KP5G / CS-V7BKP G CU-2 V19B KP5G / CS-V12B KPG 1. This equipment must be earthed. It may cause electrical shock if grounding is not perfect. 2.
Page 41
CS-V9BK PG CU-2 V14B KP5G / CS-V9BKP G CU-2 V18B KP5G / CS-V9BKP G CU-3 V20B KP5G / CS-V7BKP G CU-2 V19B KP5G / CS-V12B KPG Attached accessories Indoor/Outdoor Unit Installation Diagram Applicable piping kit CZ-3F5, 7AEN (CS-V7BKPG, CS-V9BKPG) CZ-4F5, 7, 10AN (CS-V12BKPG) SELECT THE BEST LOCATION INDOOR UNIT •...
CS-V9BK PG CU-2 V14B KP5G / CS-V9BKP G CU-2 V18B KP5G / CS-V9BKP G CU-3 V20B KP5G / CS-V7BKP G CU-2 V19B KP5G / CS-V12B KPG 10.2. INDOOR UNIT 10.2.1. SELECT THE BEST LOCATION 10.2.3. TO DRILL A HOLE IN THE WALL (Refer to “Select the best location”...
Page 43
CS-V9BK PG CU-2 V14B KP5G / CS-V9BKP G CU-2 V18B KP5G / CS-V9BKP G CU-3 V20B KP5G / CS-V7BKP G CU-2 V19B KP5G / CS-V12B KPG 3. For the embedded piping (This can be used for left rear piping & left bottom piping also.)
Page 44
CS-V9BK PG CU-2 V14B KP5G / CS-V9BKP G CU-2 V18B KP5G / CS-V9BKP G CU-3 V20B KP5G / CS-V7BKP G CU-2 V19B KP5G / CS-V12B KPG 10.2.5. CONNECT THE CABLE TO THE INDOOR UNIT 1. The inside and outside connecting cable can be connected without removing the front grille.
“ON/OFF” change over of remote control receiving sound. MODEL Piping size (Torque) Liquid CS-V7BKPG 3/8” (42 N.m) 1/4” (18 N.m) CS-V9BKPG 3/8” (42 N.m) 1/4” (18 N.m) CS-V12BKPG 1/2” (55 N.m) 1/4” (18 N.m)
Page 46
CS-V9BK PG CU-2 V14B KP5G / CS-V9BKP G CU-2 V18B KP5G / CS-V9BKP G CU-3 V20B KP5G / CS-V7BKP G CU-2 V19B KP5G / CS-V12B KPG Connecting the Piping to Outdoor Unit 1. Align the center of the piping and sufficiently tighten the flare nut with fingers.
CS-V9BK PG CU-2 V14B KP5G / CS-V9BKP G CU-2 V18B KP5G / CS-V9BKP G CU-3 V20B KP5G / CS-V7BKP G CU-2 V19B KP5G / CS-V12B KPG 10.3.4. EVACUATION OF THE EQUIPMENT WHEN INSTALLING AN AIR CONDITIONER, BE SURE TO EVACUATE THE AIR INSIDE THE INDOOR UNIT AND PIPES in the following procedure.
These equipment shall be connected to a suitable mains network • Open front panel and remove air filters. with a main impedance less than the following: CS-V9BKPG / CU-2V14BKP5G: 0.35 Ω (Drainage checking can be carried out without removing the CS-V9BKPG / CU-3V20BKP5G: 0.19 Ω...
CS-V9BK PG CU-2 V14B KP5G / CS-V9BKP G CU-2 V18B KP5G / CS-V9BKP G CU-3 V20B KP5G / CS-V7BKP G CU-2 V19B KP5G / CS-V12B KPG d. R410A refrigerating machine oil Conventiona lly, mineral oil or a synthetic oil such as alkylbenzene has been used for R22 refrigerating machine oil. Because of the poor compatibility between R410A and conventional oils like mineral oil, however, there is a tendency for the refrigerating machine oil to collect in the refrigerating cycle.
CS-V9BK PG CU-2 V14B KP5G / CS-V9BKP G CU-2 V18B KP5G / CS-V9BKP G CU-3 V20B KP5G / CS-V7BKP G CU-2 V19B KP5G / CS-V12B KPG 11.2.2. R410A Tools 1. Cooper tube gauge for clearance adjustment (used when flaring with the conventional flaring tool (clutch type)) •...
Page 52
CS-V9BK PG CU-2 V14B KP5G / CS-V9BKP G CU-2 V18B KP5G / CS-V9BKP G CU-3 V20B KP5G / CS-V7BKP G CU-2 V19B KP5G / CS-V12B KPG 5. Charging hose • The pressure resistance of the charging hose has been raised to match the higher pressure of R410A. The hose material has also been changed to suit HFC use, and the size of the fitting has been changed to match the manifold ports.
Page 53
CS-V9BK PG CU-2 V14B KP5G / CS-V9BKP G CU-2 V18B KP5G / CS-V9BKP G CU-3 V20B KP5G / CS-V7BKP G CU-2 V19B KP5G / CS-V12B KPG 8. Electronic scale for refrigerant charging • Because of the high pressure and fast vaporizing speed of R410A, the refrigerant cannot be held in a liquid phase inside the charging cylinder when charging is done using the charging cylinder method, causing...
CS-V9BK PG CU-2 V14B KP5G / CS-V9BKP G CU-2 V18B KP5G / CS-V9BKP G CU-3 V20B KP5G / CS-V7BKP G CU-2 V19B KP5G / CS-V12B KPG 11.3. REFRIGERANT PIPING WORK 11.3.1. Piping Materials It is recommended that you use copper and copper alloy jointless pipes with a maximum oil adherence of 40 mg/10m. Do not used pipes that are crushed, deformed, or discolored (especially the inside surface).
CS-V9BK PG CU-2 V14B KP5G / CS-V9BKP G CU-2 V18B KP5G / CS-V9BKP G CU-3 V20B KP5G / CS-V7BKP G CU-2 V19B KP5G / CS-V12B KPG b. Copper pipes Use only copper pipes with the thickness given in table 10, and with minimal impurities. Because the surface of the pipe is exposed, you should take special care, and also take measures such as marking the pipes to make sure they are easily distinguished from other piping materials, to prevent mistaken use.
Page 57
CS-V9BK PG CU-2 V14B KP5G / CS-V9BKP G CU-2 V18B KP5G / CS-V9BKP G CU-3 V20B KP5G / CS-V7BKP G CU-2 V19B KP5G / CS-V12B KPG 11.4.2. Transferring (Using New Refrigerant Piping) 1. Removing the unit a. Collecting the refrigerant into the outdoor unit by pumping down The refrigerant can be collected into the outdoor unit (pumping down) by pressing the TEST RUN button, even when the temperature of the room is low.
Page 58
CS-V9BK PG CU-2 V14B KP5G / CS-V9BKP G CU-2 V18B KP5G / CS-V9BKP G CU-3 V20B KP5G / CS-V7BKP G CU-2 V19B KP5G / CS-V12B KPG 5. Set the refrigerant cylinder onto the electronic scale, then correct the hose the cylinder and to the connection port for the electronic scale.
Page 59
CS-V9BK PG CU-2 V14B KP5G / CS-V9BKP G CU-2 V18B KP5G / CS-V9BKP G CU-3 V20B KP5G / CS-V7BKP G CU-2 V19B KP5G / CS-V12B KPG <Brazing Method for Preventing Oxidation> 1. Attach a reducing valve to the nitrogen gas cylinder. 2.
CS-V9BK PG CU-2 V14B KP5G / CS-V9BKP G CU-2 V18B KP5G / CS-V9BKP G CU-3 V20B KP5G / CS-V7BKP G CU-2 V19B KP5G / CS-V12B KPG 12 Servicing Information Caution: • Pb free solder has a higher melting point than standard solder; Typically the melting point is 50 - 70°F (30 - 40°C) higher. Please use a high temperature soldering iron.
Page 61
CS-V9BK PG CU-2 V14B KP5G / CS-V9BKP G CU-2 V18B KP5G / CS-V9BKP G CU-3 V20B KP5G / CS-V7BKP G CU-2 V19B KP5G / CS-V12B KPG − Pulling out the Drain Hose from outlet to remove the Discharge Grille. (Fig. 5) −...
Page 62
CS-V9BK PG CU-2 V14B KP5G / CS-V9BKP G CU-2 V18B KP5G / CS-V9BKP G CU-3 V20B KP5G / CS-V7BKP G CU-2 V19B KP5G / CS-V12B KPG − Remove the screws at the left of the Evaporator. (Fig. 8) Fig. 8 −...
Page 63
CS-V9BK PG CU-2 V14B KP5G / CS-V9BKP G CU-2 V18B KP5G / CS-V9BKP G CU-3 V20B KP5G / CS-V7BKP G CU-2 V19B KP5G / CS-V12B KPG • Remote Control Reset When the batteries are inserted for the first time, or the batteries are replaced, all the indications will blink and the remote control might not work.
CS-V9BK PG CU-2 V14B KP5G / CS-V9BKP G CU-2 V18B KP5G / CS-V9BKP G CU-3 V20B KP5G / CS-V7BKP G CU-2 V19B KP5G / CS-V12B KPG 13 Troubleshooting Guide 13.1. Refrigeration cycle system In order to diagnose malfunctions , make sure that there are no electrical problems before inspecting the refrigeration cycle.
CS-V9BK PG CU-2 V14B KP5G / CS-V9BKP G CU-2 V18B KP5G / CS-V9BKP G CU-3 V20B KP5G / CS-V7BKP G CU-2 V19B KP5G / CS-V12B KPG 13.1.1. Relationship between the condition of the air conditioner and pressure and electric current Cooling Mode Condition of the air conditoner...
CS-V9BK PG CU-2 V14B KP5G / CS-V9BKP G CU-2 V18B KP5G / CS-V9BKP G CU-3 V20B KP5G / CS-V7BKP G CU-2 V19B KP5G / CS-V12B KPG 15 Exploded View Note: The above exploded view is for the purpose of parts disassembly and replacement. The non-numbered parts are not kept as standard service parts.
CS-V9BK PG CU-2 V14B KP5G / CS-V9BKP G CU-2 V18B KP5G / CS-V9BKP G CU-3 V20B KP5G / CS-V7BKP G CU-2 V19B KP5G / CS-V12B KPG 17 Exploded View Note: The above exploded view is for the purpose of parts disassembly and replacement. The non-numbered parts are not kept as standard service parts.
CS-V9BK PG CU-2 V14B KP5G / CS-V9BKP G CU-2 V18B KP5G / CS-V9BKP G CU-3 V20B KP5G / CS-V7BKP G CU-2 V19B KP5G / CS-V12B KPG 19 Exploded View Note: The above exploded view is for the purpose of parts disassembly and replacement. The non-numbered parts are not kept as standard service parts.
CS-V9BK PG CU-2 V14B KP5G / CS-V9BKP G CU-2 V18B KP5G / CS-V9BKP G CU-3 V20B KP5G / CS-V7BKP G CU-2 V19B KP5G / CS-V12B KPG 20 Replacement Parts List <Model: CU-2V18BKP5G> DESCRIPTION & NAME Q’TY CU-2V18BKP5G REMARKS CHASSY ASS’Y CWD50K663A AIR GUIDER FOR PROPELLER FAN CWD31094A...
Page 78
CS-V9BK PG CU-2 V14B KP5G / CS-V9BKP G CU-2 V18B KP5G / CS-V9BKP G CU-3 V20B KP5G / CS-V7BKP G CU-2 V19B KP5G / CS-V12B KPG 21 Exploded View Note: The above exploded view is for the purpose of parts disassembly and replacement. The non-numbered parts are not kept as standard service parts.
Page 79
CS-V9BK PG CU-2 V14B KP5G / CS-V9BKP G CU-2 V18B KP5G / CS-V9BKP G CU-3 V20B KP5G / CS-V7BKP G CU-2 V19B KP5G / CS-V12B KPG 22 Replacement Parts List <Model: CU-3V20BKP5G> DESCRIPTION & NAME Q’TY CU-3V20BKP5G REMARKS CHASSY ASS’Y CWD50K663A COMPRESSOR GB134PAB...
Page 80
CS-V9BK PG CU-2 V14B KP5G / CS-V9BKP G CU-2 V18B KP5G / CS-V9BKP G CU-3 V20B KP5G / CS-V7BKP G CU-2 V19B KP5G / CS-V12B KPG 23 Exploded View Note: The above exploded view is for the purpose of parts disassembly and replacement. The non-numbered parts are not kept as standard service parts.
Page 81
CS-V9BK PG CU-2 V14B KP5G / CS-V9BKP G CU-2 V18B KP5G / CS-V9BKP G CU-3 V20B KP5G / CS-V7BKP G CU-2 V19B KP5G / CS-V12B KPG 24 Replacement Parts List <Model: CU-2V19BK> DESCRIPTION & NAME Q’TY CU-2V19BKP5G REMARKS BASE ASS’Y CWD50K2063A COMPRESSOR A GB134PAB...
Page 82
CS-V9BK PG CU-2 V14B KP5G / CS-V9BKP G CU-2 V18B KP5G / CS-V9BKP G CU-3 V20B KP5G / CS-V7BKP G CU-2 V19B KP5G / CS-V12B KPG 25 Electronic Parts List <Electronic Controller Part No.: CWA742779, CWA742780 & CWA742781> SYMBOL DESCRIPTION & NAME PART NO.
Page 86
CS-V9BK PG CU-2 V14B KP5G / CS-V9BKP G CU-2 V18B KP5G / CS-V9BKP G CU-3 V20B KP5G / CS-V7BKP G CU-2 V19B KP5G / CS-V12B KPG • CU-2V14BKP5G SCHEMATIC DIAGRAM 4/7 COMPRESSOR A V-COIL COMPLETE MOTOR CAPACITOR ELECTRONIC COMP-A CAPACITOR (GRN) AC(WHT) (WHT)
Page 87
CS-V9BK PG CU-2 V14B KP5G / CS-V9BKP G CU-2 V18B KP5G / CS-V9BKP G CU-3 V20B KP5G / CS-V7BKP G CU-2 V19B KP5G / CS-V12B KPG • CU-2V18BKP5G SCHEMATIC DIAGRAM 5/7 INDOOR UNIT AC 230 V 50 Hz TO INDOOR SINGLE PHASE UNIT B OUTDOOR UNIT...
Page 88
CS-V9BK PG CU-2 V14B KP5G / CS-V9BKP G CU-2 V18B KP5G / CS-V9BKP G CU-3 V20B KP5G / CS-V7BKP G CU-2 V19B KP5G / CS-V12B KPG • CU-3V20BKP5G SCHEMATIC DIAGRAM 6/7 COMPRESSOR A COMPRESSOR B OLP A OLP B V-COIL COMPLETE MOTOR CAPACITOR CAPACITOR...
Page 89
CS-V9BK PG CU-2 V14B KP5G / CS-V9BKP G CU-2 V18B KP5G / CS-V9BKP G CU-3 V20B KP5G / CS-V7BKP G CU-2 V19B KP5G / CS-V12B KPG • CU-2V19BKP5G SCHEMATIC DIAGRAM 7/7 INDOOR UNIT AC 230 V 50 Hz TO INDOOR SINGLE PHASE UNIT B OUTDOOR UNIT...
Page 90
CS-V9BK PG CU-2 V14B KP5G / CS-V9BKP G CU-2 V18B KP5G / CS-V9BKP G CU-3 V20B KP5G / CS-V7BKP G CU-2 V19B KP5G / CS-V12B KPG...
Page 91
CS-V9BK PG CU-2 V14B KP5G / CS-V9BKP G CU-2 V18B KP5G / CS-V9BKP G CU-3 V20B KP5G / CS-V7BKP G CU-2 V19B KP5G / CS-V12B KPG How to use electronic circuit diagram TIMER TABLE Test Mode Name Time (When test point Remarks Short-circuited) Sleep Mode Waiting...