Upright Installations-Trap On Left Side - Whirlpool Gold WGFM195 Installation Instructions Manual

Gold gas-fired warm air furnace
Hide thumbs Also See for Gold WGFM195:
Table of Contents

Advertisement

Upright Standard Connections—Right Side Upflow
(Counterflow Similar)
M
L
A. Right side panel
E. Tube 1
B. Rubber elbow
F. Hose B
C. Rubber elbow drain
G. Side panel
port
grommet holes
D. Silver hose clamp
H. Tube 2 (2)
Alternate Vent/Flue Drain Hose Connections
Upright installations using the alternate vent/flue outlet will
require right side only drain hoses to be connected as follows.
Refer to "Vent/Flue Pipe and Combustion Air Pipe" for details on
alternate vent/flue pipe connection.
1. Remove the rubber plug/cap from the right-side drain port on
the front cover. Save the rubber plug/cap for later use.
2. Secure Hose A to the drain port on the front cover with a red
hose clamp.
3. Route Hose A to the rear right side panel grommet hole.
4. Remove the grommet from the front right side panel drain
hole.
5. Seal the hole in the grommet with the large end of the rubber
plug/cap removed in Step 1.
6. Reinstall the grommet and rubber plug into the side panel
drain hole.
7. Cut ¹⁄₄" (6.4 cm) from the end of the drain port on the
externally mounted rubber elbow. Discard cut portion.
8. Insert Tube 1 into the rubber elbow drain port and secure with
a silver hose clamp.
NOTE: Angle tube toward drain trap.
9. Cut 17⁷⁄₈" (45.4 cm) from the long end of Hose B. Discard cut
portion.
10. Secure the remaining end of Hose B to the exposed end of
Tube 1 with a green hose clamp.
11. Route Hose B toward the right side panel grommet holes.
12. Insert the short end of one Tube 2 through the rear right side
panel grommet drain hole.
13. Secure Tube 2 to Hose A with a green hose clamp.
14. Insert the short end of the remaining Tube 2 into Hose B from
the rubber elbow and secure with a green hose clamp.
15. Ensure that the hoses and tubes maintain a downward slope
for proper drainage and are not kinked or binding.
A
B
C
D
E
F G
H
K
J
I
I. Drain trap
J. Green hose clamps (3)
K. Hose A
L. Red hose clamp
M. Front cover drain port
Alternate Upright Upflow Connections—Right Side Only
(Counterflow Similar)
A
L
A. Front cover drain port
B. Rubber elbow (externally mounted)
C. Rubber elbow drain port
D. Silver hose clamp
E. Tube 1
F. Green hose clamps (3)
Upright Installations—Trap on Left Side
NOTE: For left side trap installation, grommets must be moved to
the left side of the furnace and the plugs installed on the right
side of the furnace.
1. Remove the rubber plug/cap from the left side of the front
cover drain port.
2. Secure Hose A to the front cover drain port with a red hose
clamp.
3. Route Hose A to the rear side panel grommet hole.
4. Cut and remove ¹⁄₄" (6.4 cm) from the end of the drain port on
the rubber elbow.
5. Insert Tube 1 into the rubber elbow drain port and secure with
the silver hose clamp. Angle Tube 1 outward toward the front
of the furnace.
6. Cut X" from the long end of Hose B and discard. Refer to the
following table for the appropriate length to cut.
7. Secure the remaining Hose B to Tube 1 with a green hose
clamp.
8. Route the other end of Hose B to the front left side panel
grommet hole.
NOTE: Long Hose B must always be connected to Tube 1 and
the elbow and not on the front cover.
9. Insert the short end of each Tube 2 through the side panel
grommet holes.
10. Secure the tubes to Hose A and Hose B with the green hose
clamps.
NOTE: Ensure hoses and tubes maintain a downward slope
for proper drainage and that they are not kinked or binding.
B
C
D
E
F
G
F
H
K
J
I
G. Hose B
H. Side panel grommet holes
I. Drain trap
J. Tube 2 (2)
K. Hose A
L. Red hose clamp
23

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gold wfd195Gold wfm195Wpio-299nGold wfd193