Page 1
Operating & Installation Manual Stratford Eco Boiler HE Stove PLEASE RETAIN THIS GUIDE FOR FUTURE REFERENCE BK127 Rev 03 Aug 2011 Part No. AFS1552...
Page 2
Should you have any questions about our Stratford Stoves that are not covered buy our manual set, please contact the Stratford dealer in your area, or call our technical support department on 0844 8475107 Copyright 2011 Arada Ltd...
Typical installation examples for boilers 16-17 and Ash removal Boiler tapping positions Optional Extra / Accessories Water connections SPARE PARTS LIST 35-37 Hot water system check list GUARANTEE Final installation check list ADDITIONAL NOTES Building Control Consent Checklist) FACTORY CHECK LIST Stratford EcoBoiler Stove...
MUST NOT BE BURNED IN THIS APPLIANCE BITUMINOUS HOUSE COAL SHOULD NEVER BE USED IN YOUR STOVE TO USE OTHER FUELS WILL INVALIDATE THE APPLIANCE GUARANTEE IF IN DOUBT CONTACT THE SOLID FUEL ASSOCIATION TELEPHONE NUMBER 0845 601 4460 www.solidfuel.co.uk Stratford EcoBoiler Stoves...
INTRODUCTION THE PRINCILE OF THE STOVE SAFETY Your Stratford stove is built to the highest standard A fireguard conforming to BS 8423:2010 should be of craftsmanship using the best materials and most used in the presence of children, the old or infirm.
Arada stoves are fitted with a data plate located on the bottom right hand side of the stove, just below the riddling shaft as shown in fig. a The data contained is as indicated in the table above. Fig. a Stratford EcoBoiler Stove...
Please note: Care should be taken to make sure that the The fitting of an extractor fan to either of these hinges are not damaged during installation. of these rooms is not permitted. Stratford EcoBoiler Stove...
INSTALLATION MULTIFUEL GRATE The grate in the Stratford EcoBoiler multi fuel unit comprises of a series of reciprocating cast iron bars seated on a pivoted comb. All bars in the grate are identical, but every other bar is turned though 180 degrees, with the ends of the bars marked ‘H’...
INSTALLATION FEDS Inspection & Fitting The Stratford EcoBoiler is not fitted with a traditional throat plate as found in most integrated boiler stoves, instead a highly efficient Flue Exhaust Diverter System is incorporated. This allows far more heat to be absorbed by the boiler jacket, and reduces the overall amount of heat wasted by slowing the flue gasses passage up the chimney.
THE FLUE PIPE MUST BE FITTED INSIDE THE OUTLET SPIGOT ( EB7 Outlet Collar) FAILURE TO with Building regulations and BS EN15287: parts 1 DO SO COULD RESULT IN THE SPILLAGE OF to 4. CONDENSATION ETC. RUNNING DOWN THE FLUE. Stratford EcoBoiler Stove...
Page 12
HETAS (Official Body to Solid Fuel Domestic BR_PDF_ADJ_2010.pdf Heating Appliances): Telephone 0845 634 5626 Details on the relevant Building Regulations and BS Web address: www.hetas.co.uk British Standards are given in the ‘General Precautions’ section of this manual. Stratford EcoBoiler Stove...
Page 13
INSTALLATION NOTE: Under no circumstances should this appliance be connected to a shared flue system, that serves any other heating appliance. Minimum 150mm (6”) Diameter Flue Maximum 100mm (4”) Typical Rear Flue Outlet (As Per BS 8303-1) Stratford EcoBoiler Stove...
Page 14
Installed to the chimney manufacturers instructions in compliance with Building Regulations and BS EN 15287 Pts 1 to 4 Typical Top Flue Outlet (AS Per BS 8303-1) PLAN VIEW OF REGISTER PLATE AND CLEARANCES FOR NON INSULATED FLUES Steel register plate 1.5mm thick minimum Stratford EcoBoiler Stove...
Warning: If a pipe-stat is not fitted to control the radiator circulation pump then cold water corrosion can occur FAILURE TO COMPLY WITH THESE REQUIREMENTS WILL INVALIDATE THE GUARANTEE. Air inlet control thermostat Easy Boost Start air inlet Stratford EcoBoiler Stove...
Central Heating and Domestic Hot water System Using Four Boiler Tapings Central Heating Without Domestic Hot water System Using Four Boiler Tapings Note: Diagrammatic representation only. Design and calculations for individual systems should always be carried out by a qualified heating engineer Stratford EcoBoiler Stove...
Page 17
Central Heating and Domestic Hot water System Using Three Boiler Tapings Central Heating Without Domestic Hot water System Using Three Boiler Tapings Note: Diagrammatic representation only. Design and calculations for individual systems should always be carried out by a qualified heating engineer Stratford EcoBoiler Stove...
Direct Systems all times. The Stratford EcoBoiler stoves are NOT The expansion tank should have a capacity of at suitable for connecting to Direct domestic hot least 7% of the systems total water capacity. The water systems.
Is the pump thermostatically controlled YES/NO by a pipe stat? Balance the radiators. Re-vent and ensure there are no air locks What is the height and distance of the hot water tank above the stove? Stratford EcoBoiler Stove...
I/We the undersigned confirm that the above details are correct. In my opinion, these works comply with the relevant requirements in part J of Schedule 1 of the Building regulations. Print name and title…………………………………………………………………..Profession………………………………….. Capacity……………………………………………………………………………...Telephone No. …………………………….. Address………………………………………………………………………………………………..Postcode………………….. Signed………………………………………………………………………………..Date………………………………………... Registered member of. (e.g. GAS SAFE,CORGI, OFTEC, HETAS, NACE, NACS)…………………………………………. Stratford EcoBoiler Stove...
Use only genuine Arada Ltd spray paint as after a prolonged shut-down period. some paints interact and spoil the stove finish For removal of the FEDS for sweeping through, and invalidate the guarantee. follow the procedure detailed on page 11 Stratford EcoBoiler Stove...
10mm spanner for the damper boss and an 8mm for the damper lock nut. Fig. 3 Copper capillary tube Turned fully clockwise 10mm & 8mm locking nuts Set gap to 29mm +/- 1mm 8mm Spacer block Stratford EcoBoiler Stove...
Re-fit & check, repeat procedure if necessary Fig. 7 NOTE: There is no adjustment to the door lock, however periodically check the tightness of the retaining screw on the end of the door handle shaft (See Fig. 8) Fig. 8 Stratford EcoBoiler Stove...
(See Fig. 9) Just before the final end, cut the rope seal to length and glue into position Allow at least 30 minutes before refitting the door to the appliance Fig. 9 Stratford EcoBoiler Stove...
The pictures detailed in Fig. 10 to 12 are designed for illustration purposes only, and may differ slightly in appearance from your stove. However the procedure detailed is the same for all the Stratford EB range of boiler stoves Stratford EcoBoiler Stove...
(See Fig. 14) Vacuum out any lose material Repeat this operation until all ash is removed Fig. 13 Fig. 14 Remove any ash build up here Ash Removal Slot Stratford EcoBoiler Stove...
Company Work Carried Out Signature Should you have any questions about your Stratford EcoBoiler stove that are not covered in this manual please contact your Arada dealer. Please keep all repair receipts safely. Please ensure you have this manual available when an engineer visits so they can complete the service record chart.
AIR INLET CONTROLS Setting Knob Stratford EcoBoiler stoves have three air inlets The air wash system (so called because pre-heated high speed air washes across the inner face of the glass, helping to keep it clear) provides the over draught air for the stove.
OPERATING INSTRUCTIONS MULTI PURPOSE OPERATING TOOL RIDDLING Your STRATFORD stove comes with a Use the operating tool to set the grate bars in the multi-purpose operating tool (Fig. 17) which is correct position for burning. The grate bars used for both setting and for riddling the multi fuel should be set to the + symbol on the indicator grate bars.
Do not light the fire if it is suspected that any part of the water system (pipe work, boiler etc) could be frozen. WARNING: Do not leave the Easy Boost air slider open for long periods , or if the stove is un-attended. Stratford EcoBoiler Stove...
Seek expert advice from your HETAS registered Ensure the area is well ventilated during this engineer. Do not attempt to re-light the stove until time. the cause of the fume emission has been identified and corrected. See page 12 for details. Stratford EcoBoiler Stove...
To enable a good flow of air through the appliance to reduce condensation and subsequent damage, leave the air controls fully open. Stratford EcoBoiler Stove...
Once again we would like to thank you for buying a Stratford EcoBoiler stove. When you buy a STRATFORD stove, you are not only buying a first class appliance you are buying a commitment from us to look after you and your appliance for as long as you want.
Factory Check list Stove Model …………………….……..………………………………. Serial No Quality I’ve checked it Finish Flue Outlet (Not EB7) and its O.K Hot Plate (Not EB7) Fuel Retainer Grate Bars Assembled By………………………. Rear Fire Bed Surrounds Checked by…………………………. FEDS Cover Air Wash Door Handle Ash Pan...
Need help?
Do you have a question about the EcoBoiler and is the answer not in the manual?
Questions and answers