GSLG-A INSTALLATION GUIDE ® OPERATOR SPECIALTY COMPANY, INC. CASNOVIA, MI 49318 • U.S.A. UL325 COMPLIANCE REQUIRES THE USE OF CONTACT EDGES OR PHOTOELECTRIC CONTROLS ON ALL AUTOMATIC OR REMOTELY-CONTROLLED GATE OPERATORS. June 2003, Rev. 11...
Model GSLG-A Mechanical Parts Exploded View ...................... 25 Model GSLG-A Mechanical Parts List ........................26 Model GSLG-A Single Phase Control Box Exploded View and Parts List ..............27 Model GSLG-A Three Phase Control Box Exploded View and Parts List ..............28 PREVENTATIVE MAINTENANCE ..........................
This electric operator is warranted for a period of two (2) detection devices have been approved for use with years from date of sale against defects in materials or OSCO slide gate operators as part of a UL325 com- workmanship. Defective part(s) shall be repaired or re- pliant installation: placed at no charge, at the manufacturer’s option.
You must use Belden 8760 Twisted Pair Shielded tors and photo eyes. Cable (or equivalent) only – OSCO part number 2500-1982, per Wire run calculations are based on the National Electrical Code, Ar- foot). See page 9 for details of this connection, as well as dip switch ticle 430 and have been carefully determined based on motor inrush, selection.
6. Make sure that the chain sag does not exceed recom- mended sizes and that the chain does not come into contact with the moving parts of the gate or ground. For optional pad mounting instructions, see OSCO drawing SIDE PLATE INSTALLATION #2700-360.
GSLG-A OPERATOR INSTALLATION GUIDE GATE BRACKET AND CHAIN ASSEMBLY INSTRUCTIONS Numbered items in these drawings are for instructional reference only. For actual part numbers, go to the parts lists in the back of this booklet. Assemble a gate bracket (1) to the front edge of the gate, Assemble the other gate bracket on the rear edge of the using two U-bolts (2), and mounting hardware (3).
VENT PLUG INSTALLATION Gear reducers used in OSCO gate operators will have solid plugs installed prior to shipment in order to keep the oil inside from spilling out during shipping. A vent plug has been provided to replace this plug during installation. This plug will look similar to the ones shown below.
Keep clear of gate during operation. All OSCO gate operators are supplied with a power disconnect switch to turn on and off the power supply available to the operator. Incoming power should be brought into the operator and connected to the labeled pigtails in the disconnect box following wiring specifications on page 4.
GSLG-A OPERATOR INSTALLATION GUIDE CONTROL BOARD ADJUSTMENTS LIMIT SWITCH L.E.D.s LIMIT SWITCH CONNECTOR TERMINAL STRIP #1 CONNECTOR 3A Fuse 2A Fuse TERMINAL STRIP #2 DIAGNOSTIC CONNECTOR L.E.D.s NOTE: DO NOT FORCE 270-DEGREE POTENTIOMETERS BEYOND THEIR NORMAL RANGE OF MOTION OR DAMAGE MAY RESULT! Auto Close Timer Adjustment: This 270-degree adjustable potentiometer will signal the operator to close automatically, provided no open, reversing or obstruction signals are present from the fully-open position.
(See page 9 for details.) You must follow all required safety precautions and instructions at all times. Review the safety brochure included with the operator. If any pages are missing or unreadable, contact OSCO at 1-800-333-1717 to request additional copies.
A three-wire shielded conductor cable is required to connect master and slave operators. You must use Belden 8760 Twisted Pair Shielded Cable (or equivalent) only – OSCO part number 2500-1982, per foot). See page 9 for details of this connection, as well as dip switch selection.
GSLG-A OPERATOR INSTALLATION GUIDE ONBOARD L.E.D. INDICATOR DESCRIPTIONS Control Board L.E.D. Indicators: OPEN This indicator is lit when an open signal is present. This signal can come from such devices as button stations, radio receivers, keypads and telephone entry systems.
GSLG-A OPERATOR INSTALLATION GUIDE IMPORTANT NOTES FOR INSTALLATION OF MASTER/SLAVE APPLICATIONS When setting up Master/Slave gate operators, it is best to make adjustments and run each operator individually. To do this, simply: a. Set Dip Switch #4 to proper hand of operation (right-hand or left-hand) b.
Check for jumping. HOW TO ORDER REPLACEMENT PARTS Use the part numbers listed on the following pages. Contact your local OSCO dealer or distributor to order parts. 1. Supply the model number and serial number of your operator.
GSLG-A OPERATOR INSTALLATION GUIDE GSLG-A MODEL MECHANICAL PARTS LIST PART NO. DESCRIPTION PART NO. DESCRIPTION 2120-359-BT Complete Enclosure with 2510-294 Power On/Off Disconnect Assembly Door Assembly for 3 Phase Operators 2120-144-BT Enclosure without Door 2500-034 Power Switch only 2120-360-BT Complete Door and Lock Assembly...
GSLG-A OPERATOR INSTALLATION GUIDE GSLG-A MODEL SINGLE PHASE CONTROL BOX PARTS LIST PART NO. DESCRIPTION PART NO. DESCRIPTION 2300-696 Clear Control Box Cover 2100-1778 Control Box Wrapper 2300-735 Heyco Bushing, 1.09 diameter 2100-1757 Control Box Mounting Plate 2200-876 Plunger, spring loaded...
GSLG-A OPERATOR INSTALLATION GUIDE GSLG-A MODEL THREE PHASE CONTROL BOX PARTS LIST PART NO. DESCRIPTION PART NO. DESCRIPTION 2100-1865 Control Box Wrapper 2500-071 Terminal Strip, 16-141 2100-1866 Control Box Cover 2500-270 Terminal Strip, 9-142 OR 2100-1864 Terminal Strip Bracket 2500-185...
Page 29
GSLG-A OPERATOR INSTALLATION GUIDE Imperial Oil MATERIAL SAFETY DATA SHEET HANDLING, STORAGE AND SHIPPING: Keep containers closed. Handle and open Date Prepared: February 02, 1996 containers with care. Store in a cool, well ventilated place away from incompatible Supersedes: January 07, 1995 materials.
• Keep clear of gate during operation. GENERAL: OSCO gate operators are designed for many years of trouble-free operation and, under recommended operating conditions, will require only minimal maintenance. To ensure that your unit is ready for operation at all times--and to preclude serious damage or failure--inspect the unit systematically.
Page 31
GSLG-A OPERATOR INSTALLATION GUIDE This page intentionally left blank. - 31 -...
GSLG-A OPERATOR INSTALLATION GUIDE GATE OPERATOR INSTALLATION CHECKLIST INSTALLER CUSTOMER ________ ________ 1. The gate has been checked to make sure it is level and moves freely in both directions. ________ ________ 2. Potential pinch areas have been guarded so as to be inaccessible OR have contact and/or non-contact obstruction sensing devices installed.
Need help?
Do you have a question about the GSLG-A and is the answer not in the manual?
Questions and answers