nokia
C
P
ONNECTING
EOPLE
CMO Operations & Logistics
WW Service Solutions & Development
Bochum / Germany
9.) Unscrew the six, Torx Plus
shown order.
For assembly, use the reverse order and
a Torx Plus
size 6 driver with a torque setting of
®
24Ncm.
11.) Remove the LCD Shielding.
13.) Protect the LCD Module with a film.
15.) Use the SRT-6 to open the LCD connector in the
order shown. Take care to the flex foil of the LCD
Module.
Service Manual 1600/1110 Level 1&2
PAGE 13 (20)
Confidential
size 6 screws in the
®
10.) Lift the LCD Shielding while pressing on the LCD
Module with a clean cloth carefully.
12.) Remove the Acoustic Channel.
14.) Take care to the surrounding components when
opening the LCD connector.
16.) Remove the LCD Module.
Copyright © 2005 NOKIA Corporation. All rights reserved.
Approved 1.0
DJk/MGR
23.06.2005