ASSEMBLING THE HOSES
With your swimming pool preparation complete, you are ready to
begin installation.
WARNING: To avoid severe injury, make sure to turn off the
pool pump prior to completing these steps.
1. The hose float is already fitted on
one of the hoses, connect this length
of hose to the Flow Regulator Valve
and twist until it locks into place.
2. Insert the second length of hose into the pool vertically in order to fill it
with water. Insert the male cuff of the first hose length into the female cuff
of the second hose length, and twist until the two lock together. The hoses
must connect fairly tightly. Continue attaching hose lengths until you reach
the required length of your pool, submerging each hose length as you go.
3. Required hose length: use enough
hose to reach the furthest point
of the pool plus add another section
as shown in the diagram. (Step 3)
4. Connect your cleaner to this
length of hose by pushing the
Flow Regulator Valve onto the
cleaner swivel. When you hear a
click, it is securely connected.
Now submerge your cleaner by
filling it with water ensuring all
trapped air has escaped.
Before connecting to the weir
ensure that all the hoses are filled
with water and all the air has
been expelled.
SECTION 1 – INSTALLATION
7
Step 1
Weir
Weir
Step 3
Need help?
Do you have a question about the MX.6 and is the answer not in the manual?
Questions and answers
Mx6 sits at bottom of wall and sits on rear of treads like popping a wheelie. If pushed out to middle of pool does the same thing
The Zodiac MX6 may sit at the bottom of the wall and lift its front (like popping a wheelie) due to uneven tread movement. One tread continues moving forward while the other intermittently reverses and then returns to forward motion. This imbalance can cause the cleaner to stay in place and tilt backward instead of moving properly. The issue may be related to a faulty engine assembly or cyclonic turbine that needs inspection or replacement.
This answer is automatically generated