Connect the necessary wiring for alarms and relays (refer to Figure 5). Only use the 24 VAC wires if PoE is not available.
Step 4
Figure 5
Alarm and Relay Wiring
Figure 6
24 VAC Wiring
Install the back box using one of the following options:
Step 5
• In-Ceiling Installation
Install the back box by compressing the spring clips and pushing the back box through the hole (refer to
–
Figure 7).
Tighten the machine screws completely to secure the back box to the ceiling.
–
Figure 7
In-Ceiling Installation
• Surface Installation
Install the back box in the surface mount ring by compressing the spring clips and pushing the back box
–
through the hole (refer to Figure 8).
24V~
5