Slant/Fin CHS-85 Installation And Operating Instructions Manual page 14

Chs series high efficiency fire tube condensing gas boiler
Hide thumbs Also See for CHS-85:
Table of Contents

Advertisement

Slant Fin Corp.
│ Installation and Operation Instructions
Figure 4-2(a) CHS 85-110 & 300-399
Near Boiler Venting (CPVC)
Swing Joint
to attain slope in
horizontal runs
CPVC Exhaust
Vent
Flue Outlet
Adapter (factory
supplied)
Figure 4-2(c) CHS 155-250
Near Boiler Venting (CPVC)
Air-inlet Pipe *
Air Inlet Adapter
(factory supplied)
Air-inlet - check with applicable local codes for acceptable pipe material.
Exhaust venting must be supported to reduce strain on piping joints. Failure to follow
these instructions may result in result in damage, serious injury or death.
In Canada, the first 3 ft (915 mm) of vent piping must be readily accessible for inspection.
14
Swing Joint
to attain slope in
Air-inlet
horizontal runs
Pipe *
Air Inlet
PVC Exhaust Vent -
Adapter
(check local codes
(factory
and Table 4-3)
supplied)
PVC Coupling
CPVC Transition
Pipe - minimum 5"
long (factory supplied)
Adapter (factory
Mandatory Vent Pipe
Transition Pipe
See Table 4-2.
Air-inlet
Pipe *
Air Inlet
Adapter
Swing Joint
(factory
to attain slope in
supplied)
horizontal runs
CPVC Exhaust
Vent
Flue Outlet
Adapter (factory
supplied)
Figure 4-2(b) CHS 85-110 & 300-399
Near Boiler Venting (PVC)
Flue Outlet
supplied)
Figure 4-2(d) CHS 155-250
Near Boiler Venting (PVC)
Swing Joint to attain
slope in horizontal runs
PVC Exhaust Vent -
(check local codes
and Table 4-3)
CPVC Transition
Pipe - minimum 5"
long (factory supplied)
Flue Outlet
Adapter (factory
supplied)
Mandatory Vent Pipe
Transition Pipe
See Table 4-2.
CHS Series
Air-inlet
Pipe *
Air Inlet
Adapter
(factory
supplied)
PVC Coupling

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Chs-155Chs-110Chs-250Chs-300Chs-399Chs-175 ... Show all

Table of Contents