MATALA WATER TECHNOLOGY Pond Vacuum II Operation Manual

Advertisement

Operation Manual
MATALA WATER TECHNOLOGY CO., LTD.
1

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Pond Vacuum II and is the answer not in the manual?

Questions and answers

Summary of Contents for MATALA WATER TECHNOLOGY Pond Vacuum II

  • Page 1 Operation Manual MATALA WATER TECHNOLOGY CO., LTD.
  • Page 2 Delivery contents please see (picture 1) Collection container with motor casing and 5 m (16 ft) cable. 2.5 m (8 ft). discharge hose with integrated blocking flap. 5 m (16 ft).suction hose, hose and piece, 5 extension tubes. 3 adjustable floor nozzles (for particle size 2, 5, 10 mm). (for particle size 1/10”,.1/5”,3/8”) Sludge collection bag.
  • Page 3 Operation Insert one of the supplied nozzles (for particle size 2, 5, 10 mm). (for particle size 1/10”,.1/5”,3/8”) Turn on the device using the main switch at the motor casing. Vacuum up the sludge with slow and even movements. Keep the vacuum hose below waist level for best performance.
  • Page 4 Pic. 1 Pic. 2 Pic. 3 Pic. 4 Pic. 5 Pic. 6 Pic. 7 Pic. 8 Pic. 9 Pic. 10 Suction Adjustment Ring -To extend vacuum time turn yellow ring on handle to open vent. - Hold Finger over vent when increased suction is needed. - Release finger when less suction is needed.

Table of Contents