Thermoheat RMC-FA60/L User's Manual And Operating Instructions

Thermoheat RMC-FA60/L User's Manual And Operating Instructions

Propane construction heater

Advertisement

USER'S MANUAL AND OPERATING INSTRUCTIONS
THERMOHEAT
MODELS:
C
ANS Z83.7-2011 CSA 2.14-2011
adequate ventilation must be provided.
GENERAL HAZARD WARNING
Failure To CoMply wiTh The preCauTionS and inSTruCTionS provided wiTh
ThiS heaTer, Can reSulT in deaTh, SeriouS Bodily injury and properTy loSS,
or daMage FroM The hazardS oF Fire, exploSion, Burn. aSphyxiaTion, CarBon
Monoxide poiSoning, and/or eleCTriCal ShoCk.
only perSonS who Can underSTand and Follow The inSTruCTionS Should
uSe or ServiCe ThiS heaTer.
iF you need aSSiSTanCe or heaTer inForMaTion SuCh aS an inSTruCTion
Manual, laBelS, eTCeTera, ConTaCT The ManuFaCTurer.
Questions, problems, missing parts? Before returning to your retailer, call our customer
service department at 877-447-4768 8:30 a.m. – 4:30 pm CST, Monday – Friday
50-10-166
RMC-FA60/L/L-01
LPFA125/L/L-01
US
GHP Group, Inc.
6440 w howard St
niles, il 60714-3302
CONSUMER: retain this manual for future reference.
or email us at customerservice@ghpgroupinc.com
PROPANE
CONSTRUCTION HEATER
(30,000/60,000 BTU/HR,
(70,000/125,000 BTU/HR, FORCED - AIR)
www.ghpgroupinc.com
Printed in China
FORCED - AIR)
Rev. 2013-03-26

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the RMC-FA60/L and is the answer not in the manual?

Questions and answers

Summary of Contents for Thermoheat RMC-FA60/L

  • Page 1 PROPANE CONSTRUCTION HEATER USER’S MANUAL AND OPERATING INSTRUCTIONS THERMOHEAT RMC-FA60/L/L-01 (30,000/60,000 BTU/HR, FORCED - AIR) LPFA125/L/L-01 (70,000/125,000 BTU/HR, FORCED - AIR) MODELS: ANS Z83.7-2011 CSA 2.14-2011 adequate ventilation must be provided. GHP Group, Inc. 6440 w howard St niles, il 60714-3302...
  • Page 3: Table Of Contents

    PROPANE CONSTRUCTION HEATER TABLE OF CONTENTS Introduction & Specifications ..........3 •...
  • Page 4: Introduction & Specifications

    PROPANE CONSTRUCTION HEATER Dyna-Glo ProPane ForceD air construction Heaters The heater is designed and approved for use as a construction heater under anS z83.7 CSa 2.14. it is hard CHECK WITH YOUR LOCAL FIRE SAFETY to anticipate every use which may be made of this heater. AUTHORITY IF YOU HAVE QUESTIONS ABOUT APPLICATIONS.
  • Page 5: General Safety Instructions

    PROPANE CONSTRUCTION HEATER General saFety instruction accidents are always tragic especially because so many of them could have been prevented with little care and judgment. There are some basic good practices, we hope you will follow for safe use of your heater. iMPortant saFety instruction •...
  • Page 6: Unpacking Heater

    PROPANE CONSTRUCTION HEATER unPacKinG Heater 1. remove heater from carton. 2. Remove all protective packing applied to heater for shipment. 3. Retain cartons and packaging material until unit is operated and found in good condition. 4. Check heater for any shipping damage. If heater shows any external or internal damage, promptly inform dealer/distributor where you purchased heater.
  • Page 7: Size & Capacity Of Propane Cylinders

    PROPANE CONSTRUCTION HEATER inForMation on siZe * caPacity oF ProPane Gas cylinDers: The chart below shows the number and size of propane tanks needed to run this heater. *Less gas is vaporized at lower temperatures. You may need two or more 100 pound tanks or one larger tank in colder weather. (See the parts list for your model of heater to get the specified regulator assembly.) Number of Tanks Temperature...
  • Page 8: Installation To The Propane Gas Tank

    PROPANE CONSTRUCTION HEATER installation to tHe ProPane Gas tanK IMPORTANT: you must use a propane/lp gas supply cylinder that is compatible with the connection device provided with the hose and regulator. propane/lp regulator Supply valve Fuel gas propane/lp Fitting hose to Tank heater FIGURE 2...
  • Page 9: Leak Checking & Positioning Heater

    PROPANE CONSTRUCTION HEATER ProPane saFety Propane is safe to use when properly handled. Careless handling of the Propane gas tank could result in fire and/or an explosion. Therefore: • Always keep tank/cylinder securely fastened in an upright position. • Avoid tipping tank on its side when connected to a regulator since this may cause damage to diaphragm in regulator.
  • Page 10: Test Firing Heater & Storage

    PROPANE CONSTRUCTION HEATER sHutDoWn instructions WARNING : Motor and fan must be running before lighting, during operation and at shutdown, in order to prevent a flame-out condition which could result in personal injury or property damage. Turn gas valve knob clockwise to OFF position.
  • Page 11: Troubleshooting

    PROPANE CONSTRUCTION HEATER troublesHootinG TROUBLESHOOTING: PROBLEM POSSIBLE   C AUSE CORRECTIVE   A CTION 1. Gas   v alve   k nob   i s   o ff   a nd   u nit 1. This   h eater   u ses   a   c on7nuous   s park 1.
  • Page 12: Wiring Diagrams

    PROPANE CONSTRUCTION HEATER WirinG DiaGraMs *LPFA125 Series Models Only 100K,125K & 150K Models only *LPFA 125 Series Sólo Modelos 100K,125K & 150KSólo modelos *LPFA125 Séries Les modéles Seulement 100K,125K & 150K Les modèles Seulement NEVER LEAVE THE HEATER UNATTENDED WHILE BURNING!
  • Page 13: Rmc-Fa60 Series/Lpfa125 Series

    PROPANE CONSTRUCTION HEATER rePlaceMent Parts list RMC-FA60 Series/LPFA125 Series MODELS: NEVER LEAVE THE HEATER UNATTENDED WHILE BURNING!
  • Page 14: Replacement Parts List

    PROPANE CONSTRUCTION HEATER rePlaceMent Parts list FA40   T HROUGH   F A150   S TEEL   B ASE   U N ITEM           PART   N UMBER DESCRIPTION No.   LPFA125   S ERIES FA60  ...
  • Page 15: Warranty

    Warranty LIMITED WARRANTY: This limited warranty is extended to the original retail purchaser of this Forced Air/Convection/Radiant Heater and warrants against any defect in materials and workmanship for a period of one (1) year from the date of retail sale. GHP Group, Inc., at it’s option, will either provide replacement parts or replace or repair the unit, when properly returned to the retailer where purchased or one of our service centers as directed by GHP Group, Inc., within one (1) year of retail purchase.
  • Page 16: Warranty Registration

    WARRANTY REGISTRATION IMPORTANT: We urge you to fill out your warranty registration card within fourteen (14) days of date of purchase. You can also register your warranty on the internet at www.ghpgroupinc.com. Complete the entire serial number. Retain this portion of the card for your records.

This manual is also suitable for:

Rmc-fa60/l-01Lpfa125/lLpfa125/l-01

Table of Contents

Save PDF