Download Print this page

Miele DG 155 Installation Instructions Manual page 8

Steam oven

Advertisement

Installing the oven
All electrical work should be performed
by a licensed electrician, in strict accor-
dance with national and local safety
regulations and standards.
– Note to installer:
Please leave these instructions with
the consumer.
– Power supply:
Please check the dataplate for verifi-
cation of:
240 VAC; 60 Hz
15A, 240 V
L1, L2, Ground
Caution:
Disconnect main power supply be-
fore servicing. To reduce the risk of
electrical shock, make sure that the
appliance is properly grounded after
installation.
WARNING : THIS APPLIANCE
MUST BE GROUNDED
8
For USA only
The appliance is provided with 3 termi-
nal leads, 1 black wire (L1), 1 red wire
(L 2) and 1 green wire (GND) which
have to be connected to a dedicated
junction box. Connect the black wire to
L1, the red wire to L2 and the green
wire to GND.
ALSO SEE THE WIRING DIAGRAM
PROVIDED WITH THE APPLIANCE.
For CDN only
The appliance is provided with 3 termi-
nal leads: 1 black wire, 1 red wire and 1
green wire which have to be connected
to a separate overcurrent protection de-
vice (fusebox or circuit breakers).
All hot wires (black and red) have to be
fused individually before connecting
them to the main power supply leads.
Use 15 Amp fuses or circuit break-
ers for appliances rated 240 VAC.
Connect black terminal wire to L1
(black) and red terminal wire to L2
(red). The green terminal wire (ground)
has to be connected directly to the
equivalent colored power supply leads.
All connections must be done in a
proper way.
ALSO SEE THE WIRING DIAGRAM
PROVIDED WITH THE APPLIANCE.

Hide quick links:

Advertisement

loading