GE ZKD910 Installation Instructions Manual
GE ZKD910 Installation Instructions Manual

GE ZKD910 Installation Instructions Manual

27" and 30" warming drawers

Advertisement

Installation
Instructions
If you have questions, call 800-GE-CARES or visit our website at: www.monogram.com
27" and 30"
Warming Drawers
Models:
ZKD910
ZTD910

Advertisement

Table of Contents
loading

Summary of Contents for GE ZKD910

  • Page 1 Installation Instructions If you have questions, call 800-GE-CARES or visit our website at: www.monogram.com 27" and 30" Warming Drawers Models: ZKD910 ZTD910...
  • Page 2: Table Of Contents

    Before you begin – Read these instructions completely and carefully. IMPORTANT – Save these instructions for local inspector’s use. IMPORTANT – OBSERVE ALL GOVERNING CODES AND ORDINANCES. Note to Installer – Be sure to leave these instructions with the Consumer. Note to Consumer –...
  • Page 3: Design Information

    ZTD910 Models 30” Wide model Available ZKD910 27” Wide model Product 27" Dimensions Drawer Open 1" Dimension A ZTD910 30” ZKD910 26-3/4” ZXD27B, ZXD30B – This kit provides for the Accessories installation of a custom front panel on 27" and 30" black and white wide models.
  • Page 4: Advance Planning

    • The drawer may be installed below a Advance countertop, a cooktop, a single or double Planning oven and side by side using 2 drawers. • The warming drawer can be installed below approved cooktops. Allow 2" min. clearance from bottom of cooktop burner box to top of warming drawer cutout.
  • Page 5: Remove The Packaging And Parts

    ZTD910 28-1/2” ZKD910 25-1/2” * NOTE: When installing the warming drawer below a cooktop, a solid barrier must be installed at least 1" from the lowest point of the bottom of cooktop burner box to the top of cutout.
  • Page 6: Installation Below Wall Ovens

    9-1/4” height. 23-1/4" 10-1/2" Dim. A Dim. B ZTD910 28-1/2” 30” ZKD910 25-1/2” 26-3/4” NOTE: Additional clearance between cutouts may be required. Check to be sure that oven supports above the Warming Drawer location does not obstruct the required interior 23-1/2”...
  • Page 7: Step 1: Provide Cabinet Support And Anti-Tip Bracket

    Provide Cabinet Support 23-1/2" IMPORTANT: When installed below a single or double oven, check to be sure that any oven supports above the cutout do not obstruct the 23-1/2” required depth of the warming drawer cutout. • A 2" min. clearance between oven and warming drawer cutouts are required.
  • Page 8 Pub. No. 49-8937-2 Dwg. No. 164D3333P167 09-04 JR Printed in the United States NOTE: While performing installations described in this book, safety glasses or goggles should be worn. ® For Monogram local service in your area, call 1.800.444.1845. NOTE: Product improvement is a continuing endeavor at General Electric.

This manual is also suitable for:

Ztd910

Table of Contents