Configuring The Cabling - HP Z800 - Workstation - 6 GB RAM Maintenance And Service Manual

Hp z800 workstation maintenance and service guide
Hide thumbs Also See for Z800 - Workstation - 6 GB RAM:
Table of Contents

Advertisement

Configuring the cabling

If the internal bays are not filled to capacity, the pre-installed blind-mate data cables for the unused
internal hard drive bays may have to be unplugged from the system board to enable the proper
connection of the hard drives installed in this bracket. After all internal and optical bay hard drives are
connected, the blind mate cabling may be reconnected to the next available ports on the system board.
NOTE:
If no additional SATA ports are available, move all optical devices to the SAS data ports. To
locate connectors on the system board, see the service label on the side access panel.
To connect the hard drive cables:
1.
Use the following figure to connect the supplied Y-adapter power cable to the power connectors
on the SFF hard drives
Figure 5-70
2.
Use the previous figure to locate the optical device power supply cable and connect it to the Y-
adapter power cable
3.
Select the SATA interconnect data cable from those supplied with the hard drive kit that best fits
the hardware configuration of the workstation.
126 Chapter 5 Replacing components
.
Connecting the power
.
2
ENWW

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Z800

Table of Contents