Wallboard Installation & Maintenance
Wallboard Installation & Maintenance

Ferrograph Wallboard 22

Introduction

The Wallboard 22 is a two line by 22-character tri-color Wallboard. It connects via a
multi-drop circuit to the host PC running the Wallboard Server application.
The display wallboard consists of the following assemblies.
Housing: A housing that is manufactured from an aluminum extrusion with anti
reflective polycarbonate screen and removable plastic end caps.
Power Supply: 9V DC switch mode power supply assembly incorporating an RJ45
chassis mounted data connector. The power supply is configurable for use from either
120V AC or 240V AC (NOMINAL VOLTAGES) supplies.
Logic Control Board: Logic control board that receives RS485 serial data from the
data RJ45 connector.
Display Board Assembly: Tri-color display board assembly, which consists of three
display boards which, are connected one to the other by a fiber optic link. The left-hand
display board receives display data from the logic control board, via a fiber optic link
and it outputs data to the next display board etc.
Each display board consists of decoding and LED row and column circuitry which
drives the LED matrix consisting of 18 5x8 LED blocks.

Installation

Before commencing installation, please check from the packing list that all parts are
included.
Packing List:
Before commencing installation, please take a couple of minutes ensuring that the final
location of the display will be both safe and practical for the customer. Also check that
the power socket provided is suitable for this type of display.
Compact Contact Center Installation Manual
40DHB0002USBG Issue 4a (05/29/2003)
1 x Wallboard 22
2 x Wall mount brackets
2 x Spun hanging wires
4 x Cavity rawl plugs
4 x Screws
2 x Eyehole bolts
2 x Masonry rawl plugs
2 x Housing clamps
1 x RJ45 Terminal Box
1 x IEC Power lead
Ferrograph Wallboard 22 - Page 49
Ferrograph Wallboard 22 - Page 49
Wallboard Installation & Maintenance

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Compact Contact Center and is the answer not in the manual?

Questions and answers

Table of Contents