Pioneer RM-V2400NA Technical Manual page 57

Multi projection unit / projection screen kit / projection frame / projection cabinet
Table of Contents

Advertisement

INSTALLATION AND ASSEMBLY
(10) Attach the adjuster (BEF1011) attached with a nut
(M8) to the rear holders R and L (BNG1205, 1206).
nut
(M8)
(11) While tilting the parts assembled at step 10, insert it
into the holes on the shoulder of the multi-projection
unit and attach with the screws (3
locations). Furthermore, pull up the adjuster to the top
of the unit while rotating it, and pull down the nut to
the rear holders R and L while rotating it to secure the
projection unit.
* Tighten the nuts tightly.
screws
(M3
12)
4'
Mounting the Projection Cabinet (RMF-V4011R)
Projection cabinet can mount to use the conventional method. For details, refer to the RM-V2000A technical manual.
56
Adjuster
(BEF1011)
Rear panel L (upper)
Rear holder L
(BMR1070)
(BNG1205)
Rear panel L (lower)
(BMR1072)
12). (2 screws
2
(12) Attach each rear panel (BMR1069, 1070, 1071, 1072) to
the unit and the rear holders R and L using the screws
(3
8). Furthermore, to cover up the gap at the top of
the projection unit, paste the hinder panel (BMR1075)
over the top board and projection unit.
Hinder panel
(BMR1075)
[After Completion]
Screw : M3
8

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents