Download Print this page
Philips Lightolier IS-PTS7 Instruction Sheet
Philips Lightolier IS-PTS7 Instruction Sheet

Philips Lightolier IS-PTS7 Instruction Sheet

Lighting systems

Advertisement

Quick Links

IS-PTS7
Lighting Systems
Cross Section
11"-1/4"
7"-1/16"
+1/8"
9"
-0"
Ceiling Tile
Ceiling Opening
9"- 7/32"
Wall
We reserve the right to change details of design, materials and finish.

Advertisement

loading

Summary of Contents for Philips Lightolier IS-PTS7

  • Page 1 IS-PTS7 Lighting Systems Cross Section 11”-1/4” 7”-1/16” +1/8“ 9” -0“ Ceiling Tile Ceiling Opening 9”- 7/32” Wall We reserve the right to change details of design, materials and finish.
  • Page 2 IS-PTS7 Lighting Systems SAMPLE PART LIST Note: Cartons are Shipped with the Following Components (Fig. 1) Wire Set Aligner Spline Standard Left hand Standard Reflectors Figure 1 Standard Fixture End Plate Kit Tele-Fixture Inside/Outside Corner Note: Facing wall, normal sequence of hanging fixtures is from left to right. Beginning with the longest fixture first and decreasing in fixture length to the right with the tele-fixture last.
  • Page 3 IS-PTS7 Lighting Systems STRAIGHT RUN INSTALLATION Fasten right hand end plate as in step 2. Screw Standard Screw Aligner Spline Washer Figure 2 We reserve the right to change details of design, materials and finish.
  • Page 4 IS-PTS7 Lighting Systems STRAIGHT RUN INSTALLATION (CONT’D) For Runs Ending in 3 or 4 Foot Fixtures before For Runs NOT Ending in 3 or 4 Foot Fixtures before Telescoping Model Telescoping Model Lamp Side Side Wall Wall Figure 3A Lamp Lamp Figure 3B We reserve the right to change details of design, materials and finish.
  • Page 5 IS-PTS7 Lighting Systems STRAIGHT RUN INSTALLATION (CONT’D) Wall Figure 4 Figure 5 Slide Lower Lamps Figure 6 Figure 7 We reserve the right to change details of design, materials and finish.
  • Page 6 IS-PTS7 Lighting Systems TELE-FIXTURE PREPARATION - ONE LIGHT RUN (Note: The over all length of the tele-fixture plus the right hand end plate must match the distance between the last hanging fixture and the wall.) (Note: To stagger the lamps, the blank channel on both the tele-fixture and the fixture before the tele-fixture may have to be measured to cut as shown in Fig.
  • Page 7 IS-PTS7 Lighting Systems TELE-FIXTURE PREPARATION - TWO LIGHT RUN (Note: The over all length of the tele-fixture plus the right hand end plate must match the distance between the last hanging fixture and the wall.) Wall Wall Figure 10 Figure 11 Screw Figure 12 Figure 13...
  • Page 8 IS-PTS7 Lighting Systems PATTERN RUN INSTALLATION Note: Read straight run installation instructions before installing pattern run. Starting from left to right facing the wall, install the reflectors. Figure 14 Faceted Reflector Note: Do not fasten fixtures to the wall with the adjustable mounting brackets until all fixtures, corners and tele-fixtures are installed. We reserve the right to change details of design, materials and finish.
  • Page 9 IS-PTS7 Lighting Systems RELAMPING PROCEDURE Step 1. Louver Removal Step 2. Relamping Figure 15 Wall Side Step 3. Louver Installation Room Side Step 4. Test - LOUVER MUST BE LEVELED Reflector Figure 16 Flange Figure 17 Figure 18 Figure 19 We reserve the right to change details of design, materials and finish.