Determining Playtime - NEC Digital Signage Software User Manual

Table of Contents

Advertisement

User Manual
There are two possibilities to determine the playtime of the Content Projects. At this time also
the display time of the currently running project ends.
If no playtime is given, the playback on the player starts immediately after the successful
content transfer.
For a pre-timed playtime please click on the dropdown arrow on the date and choose the play
date via the opening calendar. In the same way choose the desired playtime.
Notice: Please make sure that the system times of the involved Editor- and NEC Player
Systems are the same. Other wise there may be time lags.
User Manual

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents