Mounting and Cable Routing Procedures for Dell™ Digital KVM's (1082DS, 2162DS, 4322DS) 

Figure 7: Two Post Rack: System and Cables Installed

3.2.2

Routing the Power Cables and Data Cables

1.) After you have installed cables, route the power cables to one side, using hook and loop straps
or tie downs to hold the cables (user supplied). See Figure 8.
2.) Route the data cables to the other side using hook and loop straps or tie downs to hold the
cables (user supplied). See Figure 8.
3.) Cables can be bound with optional user supplied cable ties as shown in Figure 9.

Figure 8: Two Post Rack: Routing Power and Data Cables

 
 