(Part K)
(Part J)
2-2
Fix Height adjust Inside pipe (Part J) onto
2-2
the frame-mounted projector with Screw
with spring washer (Part K).
2-2
(Part K)
2-3
(Part L)
(Part F)
The user can adjust the projector to the
2-3
desired height, and then fix the Inner
Sleeve in the Outer Sleeve with Carriage
Bolt (Part L) and Nut (Part F).
2-3
(Part L)
(Part F)
(Part M)
2-4
Finally, lock Button screw (Part M) on the
2-4
Outer Sleeve, securing outer and inner
sleeves in place firmly.
(Part M)
2-4
J
K
(Part J)
F
I
M
J
3
Install the hanger on the ceiling
1
I
(Part H)
L
I
Fix Inflate Screw (Part H) onto the ceiling
Place the Inflate Screw (Part H) on the ceiling,
in the following order:
Washer
Iron Hanger
Select screws that are suitable for each type of ceiling. The enclosed Inflate
Screw (Part H) are for installation on concrete walls only.
In the case of installation on a wooden ceiling, make sure it is strong enough.
Do not install on decorated posts or plaster boards. Consult professional
personnel to select appropriate screws.
I
(Part H)
(Part H)
(Part H)
Washer
Spring Washer
(Part H)
(Part H)
G
Nut.
Need help?
Do you have a question about the Ceiling Mount-CM00G2 and is the answer not in the manual?
Questions and answers