Start Up - Gaggia GD Operating Instructions Manual

Hide thumbs Also See for GD:
Table of Contents

Advertisement

Available languages

Available languages

6 - START UP

1.
Tap
2.
Hot water outlet button
3.
Hot water outlet switch
4.
Machine on indicator
5.
Gas on/off valve
6.
Main switch
7.
Right vaporiser tap
8.
Left vaporiser tap
9.
Cup-warmer switch
10.
Boiler/pump pressure gauge
11.
Optional cappuccino maker
12.
Boiler level indicator
13.
Left vaporiser tap
14.
Right vaporiser tap
15.
Hot water outlet pipe
16.
Unit D control keyboard
17.
Unit E control keyboard
18.
Optional dose-counter display
19.
E delivery indicator
20.
D delivery led
Once the water, gas and electrical connections have been made,
proceed to start up the machine.
Open the mains water supply tap (A).
Close the protection switch (D)
Position the machine main switch (8) to position
on indicator will come on (3).
The auto-levelling device will come into operation so that the water
reaches a normal level in the boiler (12).
Position the main switch (6) to position
power or to position
powering the resistances.
Wait for the pressure to reach its operational pressure 1.1÷1.3 atm
checking the boiler pressure on the gauge (10).
Should the machine fail to stabilize on the indicated values it is
necessary to calibrate the pressure switch as described in
paragraph 6.2.
In the event of a machine featuring a gas heating system, it is
necessary to switch on the gas by operating the gas valve (4) after
operating the main switch (6), keeping the piezoelectric switch
pressed (5) until the gas remains on.
Then check the pressure on the pump gauge (10) putting a unit
into operation with filter holder engaged filled with ground, dosed
and pressed coffee in order to achieve an effective working pressure
of 8/9 atm.
Should re-calibration of the pump pressure be necessary this
operation should be undertaken as indicated in paragraph 6.3.
The machine is now ready for use.
the machine
for operation at normal
for operation at full power, thereby
IMPORTANT
Do not press the hot water delivery switch or button (2)
before the correct working temperature of 1.1 atm is
reached, as indicated on the boiler gauge (10).
6.1
LONG COFFEE GIGLEUR
The machine is fitted with a gigleur ( 1 per unit) with a clearance of
0.6 mm (Cod.26G0074/01).
For greater coffee delivery speed, in the case of long coffees, no.2
gigleurs are also included with the machine (complete with seals)
with a clearance of 0.8 mm (Cod.26G0073/01).
The gigleur is located in the exchanger supply fitting (1 per group).
36

Hide quick links:

Advertisement

Chapters

Table of Contents
loading
Need help?

Need help?

Do you have a question about the GD and is the answer not in the manual?

Questions and answers

This manual is also suitable for:

Gege-gd

Table of Contents

Save PDF