Figure 6.36 Reattach C-Clamp Installation
Item
1
NOTE: Additional brackets for drop rod hangers are provided for larger busplugs.
15. Perform an overall check for any debris, dust, or misalignment.
16. Insulation resistance test installation prior to energization of busway.
17. If a neutral line is present, ensure the neutral link is connected before turning the busplug ON.
CAUTION: If removing the line side shield for any reason.
6 Installation
Description
Re-attach and properly torque C -Clamps to 15 Nm (11 ft-lbs).