Download Print this page

Vertiv High PowerBar UL 857 Installer/User Manual page 57

Advertisement

Figure 6.36 Reattach C-Clamp Installation
Item
1
NOTE: Additional brackets for drop rod hangers are provided for larger busplugs.
15. Perform an overall check for any debris, dust, or misalignment.
16. Insulation resistance test installation prior to energization of busway.
17. If a neutral line is present, ensure the neutral link is connected before turning the busplug ON.
CAUTION: If removing the line side shield for any reason.
6 Installation
Description
Re-attach and properly torque C -Clamps to 15 Nm (11 ft-lbs).
Proprietary and Confidential ©2024 Vertiv Group Corp.
Vertiv™ High PowerBar (HPB) UL 857 Installer/User Guide
53

Advertisement

loading
Need help?

Need help?

Do you have a question about the High PowerBar UL 857 and is the answer not in the manual?

Questions and answers

This manual is also suitable for:

Hpb ul 857