Download Print this page
Hide thumbs Also See for RT5427 HV:

Advertisement

Quick Links

RAYSTECH (TIANJIN) PV ENERGY CO., LTD.
Your Trusted Solar Partner
Version: 1.2
RAYSTECH (TIANJIN) PV ENERGY CO., LTD.
1

Advertisement

loading
Need help?

Need help?

Do you have a question about the RT5427 HV and is the answer not in the manual?

Questions and answers

Summary of Contents for RAYSTECH RT5427 HV

  • Page 1 RAYSTECH (TIANJIN) PV ENERGY CO., LTD. Your Trusted Solar Partner Version: 1.2 RAYSTECH (TIANJIN) PV ENERGY CO., LTD.
  • Page 2 – Method 1 mandatory requirements and Optional requirements – a), c), e), f), g), h), i), j), k), l), m), n), o), p), q). Declaration Raystech declares that the RT 5427 HV is in compliance with the essential requirements and other relevant of RE Directive 2014/53/EU. Importer name: XXX (Located in EU)
  • Page 3 RAYSTECH (TIANJIN) PV ENERGY CO., LTD. Your Trusted Solar Partner CONTENT 1. Safety Introduction ........................4 1.1 Important Safety Instructions ..................4 1.2 Warnings in this Document ....................4 1.3 Battery Handling Guide ....................5 1.4 Response to Emergency Situations ................5 1.4.1 Leaking Batteries ....................5 1.4.2 Fire ...........................
  • Page 4 A warning describes a hazard to equipment or personnel. It calls attention to a procedure or practice which if not correctly performed, can result in damage to or destruction of part or all of the Raystech equipment and/or other equipment connected to the Raystech equipment or personal injury.
  • Page 5 The battery is not suitable for users to use by themselves. 1.4 Response to Emergency Situations The Raystech battery is designed with multiple safety strategies to prevent hazards resulting from failures. However, Raystech cannot guarantee their absolute safety in uncertain situations.
  • Page 6 If the battery catches fire, it will produce poisonous gases. Do not approach. 1.4.3 Wet battery If the battery is wet or submerged in water, do not try to access it. Contact Raystech Customer Service or your distributor for technical assistance.
  • Page 7 These products shall be handled with care and immediately inspected if visibly damaged. If the carton is visibly damaged, please contact with Raystech customer service to confirm whether the battery can be used safely or not.
  • Page 8 Cell UL TUV Safety CE/TUV Hazardous Material Classification Transportation UN 38.3 Product Warranty 10 years warranty Testing conditions are based on a temperature 25℃ at the beginning of life. *Total Energy/Usable Energy measured under specific conditions from Raystech 0.2C CC-CV.
  • Page 9 RAYSTECH (TIANJIN) PV ENERGY CO., LTD. Your Trusted Solar Partner 3.2 Indicators and Ports 3.2.1 Indicators There are LED indicators on the front of the battery to show its operating status. Item Designation Definition Showing the SOC of battery 3.2.2 Power and Communication Ports...
  • Page 10 RAYSTECH (TIANJIN) PV ENERGY CO., LTD. Your Trusted Solar Partner The master battery to inverter: CAUTION By CAN communicating with inverter. connect INV_CANH and INV_CANL to the inverter. By RS485 communicating with inverter. connect INV_RS485_A and INV_RS485_B to the inverter.
  • Page 11 RAYSTECH (TIANJIN) PV ENERGY CO., LTD. Your Trusted Solar Partner 3.3 Solution of Raystech...
  • Page 12 RAYSTECH (TIANJIN) PV ENERGY CO., LTD. Your Trusted Solar Partner 3.4 Feature The Raystech Energy Storage battery has the following features: Energy storage unit This battery is suitable for photovoltaic system compatibility.  Battery management system (BMS) The built-in battery BMS monitors its operation ...
  • Page 13 RAYSTECH (TIANJIN) PV ENERGY CO., LTD. Your Trusted Solar Partner 4.2 Installation Position Make sure that the installation position meets the following conditions: The building is designed to withstand earthquakes.  Far away from the sea to avoid salt water and humidity.
  • Page 14 RAYSTECH (TIANJIN) PV ENERGY CO., LTD. Your Trusted Solar Partner 4.4 Safety Instruments When dealing with the battery, the following safety gear should be equipped. Installers must meet the relevant requirements of IEC 62040 and IEC 62619 or the domestic legislation and other relevant international standards.
  • Page 15 RAYSTECH (TIANJIN) PV ENERGY CO., LTD. Your Trusted Solar Partner 5. Battery Installation 5.1 Checks Before Installation There are a few things to check before installing the battery to ensure that it has no defects. Check the battery voltage according to the following instruction: Press and hold the panel button for 4s and release after indicators turning on.
  • Page 16 RAYSTECH (TIANJIN) PV ENERGY CO., LTD. Your Trusted Solar Partner 5.3 Connection Between Batteries 1. Turn on the Breaker: Breaker is on the top of the battery covered by a panel, open the panel . Turn on the Breaker and install the panel again.
  • Page 17 RAYSTECH (TIANJIN) PV ENERGY CO., LTD. Your Trusted Solar Partner 3. This product is easily mounted, just plug the upper battery into the lower one as below. Then fix the device to the wall with M6 expansion screws tightly. 6.Commissioning 6.1 Commissioning Battery...
  • Page 18 RAYSTECH (TIANJIN) PV ENERGY CO., LTD. Your Trusted Solar Partner 6.2 Shutting Down Battery Shut down the battery only when the battery is no charging or discharging which can be seen in your phone with APP. 1. Press and hold the Panel Button for 5s, release after the whole lights are off.
  • Page 19 OTHER (incl. Art. 3(3) and voluntary specs): N/A Accessories: N/A Software: N/A Technical file held by: RAYSTECH (TIANJIN) PV ENERGY CO., LTD Place and date of issue (of this DoC): ......Signed by or for the manufacturer: ................. (Signature of authorised person) Name (in print): ..............
  • Page 20 RAYSTECH (TIANJIN) PV ENERGY CO., LTD. Your Trusted Solar Partner RAYSTECH (TIANJIN) PV ENERGY CO., LTD.