Huawei SUN2000 MAP0 Series, SUN2000-8K-MAP0, SUN2000-5K-MAP0, SUN2000-12K-MAP0 Manual

Huawei SUN2000 MAP0 Series, SUN2000-8K-MAP0, SUN2000-5K-MAP0, SUN2000-12K-MAP0 Manual

Also See for SUN2000 MAP0 Series:

Advertisement

Huawei SUN2000 MAP0 Series, SUN2000-8K-MAP0, SUN2000-5K-MAP0, SUN2000-12K-MAP0 Manual

Introduction

Before installing the equipment, read the user manual carefully to get familiar with product information and safety precautions. The product warranty does not cover equipment damage caused by failure to follow the storage, transportation, installation, and usage guidelines specified in this document and the user manual. Scan the QR code on the equipment to view the user manual and safety precautions. The information in this document is subject to change without notice. Every effort has been made in the preparation of this document to ensure accuracy of the contents, but all statements, information, and recommendations in this document do not constitute a warranty of any kind, express or implied.

Installation Requirements

Installation Requirements

Installing the Device

Installing the Device

Preparing a PE Cable

Preparing a PE Cable

Preparing DC Cables

Preparing DC Cables
Use the positive and negative metal terminals and DC connectors supplied with the inverter.

Preparing an AC Cable

cautionshock hazard

  1. Do not connect loads between the inverter and the AC switch that directly connects to the inverter. Otherwise, the switch may trip by mistake.
  2. If an AC switch is used with specifications beyond local standards, regulations, or Huawei's recommendations, the switch may fail to turn off in a timely manner in case of exceptions, causing serious faults.
  3. Each inverter must be equipped with an AC output switch. Multiple inverters cannot connect to the same AC output switch.
  4. To ensure that the inverter can be safely disconnected from the power grid when an exception occurs, connect an AC switch to the AC side of the inverter. Select an appropriate AC switch in accordance with local industry standards and regulations.
Component Description Rated Voltage Rated Current
AC switch Recommended: three-phase AC circuit breaker ≥ 415 V AC 5K and 6K: 16 A
8K: 25 A 10K and 12K: 32 A

cautionshock hazard
Strip the insulation layers of the AC output power cable by the recommended length (17–19 mm) to ensure that the cable conductors are completely inside the conductor insertion points and no insulation layer is pressed into the conductor insertion points. Tighten the cable conductors to a torque of 2.8–3.2 N·m. Otherwise, the device may fail to run properly or be damaged during operation.
Preparing an AC Cable

Preparing Signal Cables

Preparing Signal Cables - Step 1
Preparing Signal Cables - Step 2

1 2 3 4 5 6 7 8
White/ Orange Orange White/ Green Blue White/Blue Green White/ Brown Brown

Preparing Signal Cables - Step 3


Shield layer grounding

  1. Cascaded Inverter
  2. Power meter
  3. Ripple control device
  4. Rapid shutdown switch

Electrical Connections

Electrical Connections - Step 1
Electrical Connections - Step 2

Power-On and Commissioning

Power-On and Commissioning

Documents / Resources

Download manual

Here you can download full pdf version of manual, it may contain additional safety instructions, warranty information, FCC rules, etc.

Download Huawei SUN2000 MAP0 Series, SUN2000-8K-MAP0, SUN2000-5K-MAP0, SUN2000-12K-MAP0 Manual

Advertisement

Need help?

Need help?

Do you have a question about the SUN2000 MAP0 Series and is the answer not in the manual?

Questions and answers

Table of Contents