Cleaning Procedure - Hoshizaki AM-50BAE Instruction Manual

Self-contained cuber
Hide thumbs Also See for AM-50BAE:
Table of Contents

Advertisement

2. Cleaning Procedure

The cleaning process will remove lime deposits from the water system.
1) Remove all ice from the evaporator and the storage bin.
Note: To remove cubes on the evaporator, move the control switch to the "OFF" position
and move it back to the "ICE" position after 3 minutes. The defrost cycle starts
and the cubes will be removed from the evaporator.
2) Move the control switch to the "OFF" position. Close the water supply line shut-off valve.
3) Disconnect the suction tube by
compressing both plastic tabs to unlock the
joint in the direction of the black arrows and
pulling the tube clear.
4) Spread out the tabs on both sides of the
water tank to unlock it, then pull it out
toward you. Drain the tank.
5) After draining, slide in the water tank along
the rails at the bottom of the right and left
brackets until it clicks into place.
6) Refit the suction tube onto the water tank
inlet by pushing the joint to lock it securely
in the direction of the arrows. A loose fitting
may cause a water leak.
7) Slowly pour the cleaning solution into the water tank.
8) Move the control switch to the "WASH" position.
9) After circulating the cleaning solution for about 30 minutes, move the control switch to
the "OFF" position.
10) Remove the water tank, drain it, and replace it as described in 3) through 6).
11) Open the water supply line shut-off valve.
Suction Tube
Unlock
Lock
Rail
27
Joint
Drain
Unlock
Lock
Water Tank
Bracket
Rail

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the AM-50BAE and is the answer not in the manual?

Questions and answers

This manual is also suitable for:

Am-50bae-adAm-50bae-addsAm-50bae-ds

Table of Contents

Save PDF