BAS and Modbus Integration
BAS Integration
IntelliStation 2 provides user-directed control and monitoring of
water distribution systems. It is the user's responsibility to select
and maintain water temperatures and pressures that are safe
and appropriate for the water system users, guests and facility.
The Sanitization mode is intended for use as part of a user-directed,
controlled and supervised protocol that has been safely and properly
designed. It is recommended to install IntelliStation 2 as part
of a ASSE 1070 compliant water distribution system, including
point-of-use mixing valves. Always read and follow Installation,
Operation, and Maintenance Manual and all product warnings and
labels, and comply with all governmental and safety requirements.
BEFORE attempting to connect BAS, a certified and qualified
electrician MUST fully de-energize and disconnect all electrical
power from IntelliStation 2.
Perform required LOCKOUT/TAG OUT procedures.
BAS connection MUST be performed by certified and qualified
electrician.