WWW.leaptonpv.com 1 Safety Precaution General Disclaimer The information in this user manual is subject to change due to product updates or other reasons. This guide cannot replace the product labels or the safety precautions in the user manual unless otherwise specified. All descriptions in the manual are for guidance only.
Page 3
WWW.leaptonpv.com • To protect the battery pack and its components from damage during transportation, please ensure that the transportation personnel are professionally trained. All operations during the transportation have to be recorded. The equipment shall be kept in balance, thus avoiding falling down. •...
WWW.leaptonpv.com Label Description Potential risks exist. Wear Do not place at the children proper PPE before any and pet touchable area. operations. HIGH VOLTAGE HAZARD. High voltage exists during the equipment's running. Do not reverse connection Ensure the equipment is the positive and negative.
Page 8
WWW.leaptonpv.com � DANGER If a battery pack is dropped or violently impacted during installation, internal damage may occur. Do not use such battery packs; otherwise, safety risks such as cell leakage and electric shock may arise. Installation Environment Requirements • The installation and use environment must meet relevant international, national, and local standards for lithium batteries, and are in accordance with the local laws and regulations.
Page 9
WWW.leaptonpv.com Installation Space >300mm >300mm IP65 -20~50℃ 300-600mm >300mm >300mm 5%~95% RH Installation Space 520mm 220mm 1215mm Battery 4(20kWh) 280mm 935mm Battery 3(15kWh) 280mm 655mm Battery 2(10kWh) 280mm Battery 1(5kWh) 280mm 375mm 60mm 800mm 560mm DANGER Avoid drilling holes in the water pipes and cables buried in the wall.
Page 10
WWW.leaptonpv.com 3.2 Installation the Base Support Wall Baseboard 25~35mm 65mm Keep a distance of 35mm to 45mm between the support and the wall surface 560mm Right Left Pack Mounting Holes H o l i n g u n t 2 0 k Diameter:10mm;...
WWW.leaptonpv.com Installing Battery NOTICE • The following describes how to install the battery expansion modules for a 20kWh model. • The installation of battery for 5kWh, 10KWh and 15kWh models is the same. One battery expansion module is installed for a 5kWh model, two battery expansion modules are installed for a 10kWh model, three battery expansion modules are installed for a 15kWh model.
Page 12
WWW.leaptonpv.com NOTICE The top battery module must be secured to the wall. Secure the battery modules in the midddle to the wall.(Optional) Install the remaining battery modules and power control unit from bottom to top. After installing a module, secure the left and right mounting holes, and then install secure the battery to the wall.
WWW.leaptonpv.com 4 Electrical Connection DANGER • Connect cables in accordance with local installation laws and regulations. • Before connecting cables, ensure that the air switch on the PCU is set to OFF. Otherwise, the high voltage of the battery may result in electric shocks. 4.1 Wiring Diagram for battery system WIFI LINK...
Page 14
WWW.leaptonpv.com 4.2 Connecting the PE Cable NOTICE If the PE cable in the delivables cannot match the installation environment. The PE cable can be prepared by the customer. Recommended specifications: • Type: single-core outdoor copper cable • Cross-sectional area: 4-6mm L=L1+(1~2)mm 4mm²≤S≤6mm²...
WWW.leaptonpv.com Connecting the Communication Cable 1 2 3 4 5 6 7 8 LINK Description CAN_GND2 CAN_GND2 BMS communication for battery Addr_OUT Addr_IN system parallel connection CANH2 CANH2 CAN3H Connects to the invert BMS communication port to communication CAN3L with the invert BMS communication for battery CANL2 CANL2...
WWW.leaptonpv.com Connecting the Power Cable Strip the insulating layer Rivet terminal . Ensure the Push the riveted pin into the of cable. L=7±0.5mm; concentricity of metal parts insulator until they engage. S=10mm²; and cable at same level, Pull lightly on the lead to Be attention and not to cut off crimped metal parts and check that the metal part has...
WWW.leaptonpv.com 5 Verifying the Installation Acceptance The battery is installed correctly and securely. The cables are routed properly as required by the customer. Cable ties are secured evenly and no burr exists. The ground cable is connected correctly and securely. The battery switch and all switches connected to the battery are OFF.
80~100% SOC,Power OFF FAULT Download APP Method 1: Search for Leapton Air on App Store or Google play and download the latest installation package; Method 2: Access https://leapton.inteless.com using the mobile phone or PC browser and download the latest installation package.
Page 19
WWW.leaptonpv.com 6.4 Battery Deployment Account registration and fill in the information Sign Up Sign Up Phone Number Phone Number E-Mail E-Mail (+86) Please input phone number Please input E-mail Please input your phone number/E-mail Please input verification code GET CODE Please input verification code GET CODE Please enter password...
Page 20
WWW.leaptonpv.com Tools Wi-Fi Configuration Scan QR Code pulling@pullingenergy.com > pulling@pullingenergy.com Scan QR Code Tools > Wi-Fi Configuration Bluetooth Language > Personalization Hotspot > Notification About Us > Current Version 1.0.1 > Sign Out Dashboard Plants Equipment Event Choose a router Pleaes select the router to be connected to the gateway TP-LINK_Guest_4675...
Page 21
WWW.leaptonpv.com Wi-Fi Configuration ●Device power up Choose a router Scan QR Code Device List Please make sure that the gateway is powered on. Please select the router to be connected to the Please select the gateway you want to configure When the gateway is powered on,the red LED is always gateway Bluetooth...
Need help?