Installing/removing the heavy load lattice extension

Risk of accidents due to the heavy load lattice extension falling down
Only use appropriate lifting gear having sufficient lifting capacity;
à
Transport dimensions and weights , p. 2 - 1.

Installing the heavy load lattice extension

If the heavy load lattice extension is installed, the swing-away lattice
extension cannot be rigged in front of the main boom.
Prerequisites:
– The truck crane is on outriggers or the main boom has been placed on the
boom rest.
– The required counterweight has been rigged.
– The heavy load lattice extension is at an angle of 0°.
– An auxiliary crane is available.
For installation, the heavy load lattice extension is fastened in the holding
device (1) with pins (2).
Attach the heavy load lattice extension at the slinging point (1);
à
p. 6 - 3.
Attach the guide rope to the rope attachment point (2);
6.3 Installing/removing the heavy load lattice extension
3 112 319 en
Heavy load lattice extension
à
p. 6 - 4.
s
6 - 5

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Grove GMK 5220 and is the answer not in the manual?

Questions and answers

Table of Contents