  • Page 1 V2H Bundle Installation Manual Version 1.0 - April 2024...
  • Page 2: Table Of Contents

    Before You Begin ........................................12 Installation Outline ........................................13 GM Energy PowerShift Charger Only Install .............................. 13 GM Energy V2H Bundle Install (GM Energy PowerShift + V2H Enablement Kit) ..............13 Install Components and Conduit ....................................14 Charger Details ........................................... 17 Home Hub Details ........................................
  • Page 3 E.1.2 Inverter ........................................90 E.1.3 Hub ...........................................90 E.2 Field-Replaceable Components ..................................90 E.2.1 Charger ........................................90 E.2.2 V2H Enablement Kit Components (Inverter, Hub, and Dark Start) ................91 Appendix F: Troubleshooting ......................................91 Appendix G: Exploded View......................................92 GM Energy V2H Bundle Installation Manual...
  • Page 4 Appendix H: System & Voltage Checks Form ................................ 94 Appendix J: Commissioning App Settings ................................95 GM Energy V2H Bundle Installation Manual...
  • Page 5: Safety, Warnings, And Compliance

    Note and observe all warnings and remove all sources of energy prior to interfacing wiring or electrical panels. WARNING! The GM Energy Home V2H Bundle should not be used as a primary or backup power source for medical equipment or any other products in which failure could lead to injury or loss of life.
  • Page 6: Introduction

    • GM Energy Dark Start Battery (“Dark Start Battery” or “DSB”) IMPORTANT: The installation content in this document is solely focused on the GM Energy V2H Bundle (GM Energy PowerShift Charger, GM Energy Inverter, GM Energy Home Hub, GM Energy Dark Start Battery).
  • Page 7: Tools, Materials, And Fasteners

    In addition to standard electrician and torque tools, a T20 Torx, a 9/32″ deep socket, and Allen wrenches are also required. In addition, the installer shall provide all cables, conductors, and fasteners called out in subsequent sections of this guide. All these items must conform to GM Energy specifications. GM Energy V2H Bundle Installation Manual...
  • Page 8: Main Components

    *Installation of the Rapid Shutdown Device or Emergency Shutdown Device is highly recommended and may be required based on local code or ordinance. Please consult with a qualified installer or electrician for more information. GM Energy V2H Bundle Installation Manual...
  • Page 9: Equipment Requirements

    Dark Start: 32°F (0°C) 113°F (45°C) Charge −40°F (−40°C) 185°F (85°C) Dark Start: −4°F (−20°C) 122°F (50°C) Discharge Sun shading is recommended for installation locations exposed to direct sunlight where ambient temperatures exceed 104°F (40°C). GM Energy V2H Bundle Installation Manual...
  • Page 10: Clearance

    Figure 3 must be maintained (unless noted as recommendation) to limit equipment derating in certain operating modes, temperatures, and power levels. Refer to local regulations for additional guidance on mounting position. *Dimension is recommendation Figure 3: V2H Bundle Clearances GM Energy V2H Bundle Installation Manual...
  • Page 11: Distance Between Components

    * Note: Usable Dark Start state of charge is reduced (less available time for dark start recovery) if the distance between Inverter and Charger exceeds 49’ (15 m) Maximum Elevation The components of the V2H Bundle are not to be installed in locations with an elevation of greater than 3000m above sea level. GM Energy V2H Bundle Installation Manual...
  • Page 12: Before You Begin

    GM Energy provides recommendations of job closeout photos to take in the Job Closeout section, as these may be beneficial for both the installer and GM Energy to best support the customer if they require service in the future.
  • Page 13: Installation Outline

    Installation Outline GM Energy PowerShift Charger Only Install For installation of the Charger only, please see the GM Energy PowerShift Charger Installation Manual available at https://gmenergy.gm.com/for-home/installation-support GM Energy V2H Bundle Install (GM Energy PowerShift + V2H Enablement Kit) Your actual sequence may vary based on site conditions and chosen workflow. The Hub and the Inverter have usable knockouts pre-drilled—you may NOT create any additional knockouts in the Hub or in the Inverter.
  • Page 14: Install Components And Conduit

    For example, the Rapid Shutdown Device (RSD) control cable from the Inverter must route in an appropriate raceway. If you are only installing the Charger, only the 120/240 V circuit (with grounding conductor) is required. GM Energy V2H Bundle Installation Manual...
  • Page 15 1/4″ × 2 3/4″ concrete screws (min. qty. 4) 3/16″ masonry brick bit pilot hole All surfaces Dark Start M6 screws (qty. 2). Included with except concrete Concrete 1/4″ × 1 1/2″ concrete screws (qty. 2) 3/16″ pilot hole Table 1 GM Energy V2H Bundle Installation Manual...
  • Page 16 *Hub and Inverter also require one M6 screw (and anchor) at each lower front corner. Figure 5: Fastener locations for Charger Figure 6: Fastener locations for Hub GM Energy V2H Bundle Installation Manual...
  • Page 17: Charger Details

    Attach the inner cover to the plug holder with two Phillips head flanged screws and torque each to 10.4 in-lb. d. Reattach the front cover (it will click into place). Coil the charging cord around the holster, and then insert the Charger nozzle into the holster. GM Energy V2H Bundle Installation Manual...
  • Page 18: Home Hub Details

    After installing the Home Hub, install the antenna from the accessory bag onto the threaded port at the bottom left of the Hub, taking care not to block the antenna area with raceway conduit bodies. See Section 3.0 for full details on accessories. GM Energy V2H Bundle Installation Manual...
  • Page 19: Inverter Details

    The Inverter has DC inputs for a stationary storage battery and Solar panels. At the time of this manual publishing date, these features are not enabled. Further documentation will be made available at https://gmenergy.gm.com/for- home/resources-and-support when the features become available. For further information, please call the GM Energy Support Center at 1-833-64POWER GM Energy V2H Bundle Installation Manual...
  • Page 20: Dark Start Battery Details

    ON and OFF positions. The RSD control circuit must be wired into the Inverter. See Appendix C for example switch. It is recommended this switch be located near the home electric meter and be clearly labeled. GM Energy V2H Bundle Installation Manual...
  • Page 21: Hub Configuration And Accessories

    7/16″ socket (Figure 12). Torque each nut to 48 in-lb. 3. With a 9/32” deep socket, remove the main breaker housing flange nut, install the main breaker, and then reinstall the flange nut. Figure 11: Location of bonding strap for main service panel GM Energy V2H Bundle Installation Manual...
  • Page 22 If the Hub will be used as the main service panel, affix the MAIN SERVICE DISCONNECT label on the Hub dead front above the opening for the main breaker (Figure 13): Figure 13: Location to apply MAIN SERVICE DISCONNECT label GM Energy V2H Bundle Installation Manual...
  • Page 23 5. Fit the L1 and L2 CTs around their respective conductors, and attach each to the conductor with one zip tie below and one zip tie above. Figure 15: Location of CT bracket screws and zip ties holding CTs to bracket GM Energy V2H Bundle Installation Manual...
  • Page 24: Optional Non-Backup Panel

    Install branch breaker in Hub non-backup panel then route L1 black and red conductors to non-backup breaker. Terminate, torque, and paint mark terminations. Note: Do not feed an exterior subpanel directly from the main PCB connector (EVL1 & EVL2) GM Energy V2H Bundle Installation Manual...
  • Page 25: Optional Second Energy Meter (For Ac Solar Integration)

    Enablement Kit. 2. If you are not a Preferred Installer – or are one and did not indicate need at the outset – you may contact GM Energy Support Center at 1-833-64POWER to obtain one.
  • Page 26: Wire The Components

    Figure 18: Charger wiring diagram Charger Only If the installation is for a standalone Charger only (no V2H Enablement Kit), route and install only the AC power circuit conductors (Figure 18 callout 1 and Table 2). GM Energy V2H Bundle Installation Manual...
  • Page 27: Charger To Home Hub (Non-Backup Panel)

    From the Inverter, route minimum #8 AWG red and black conductors to the Charger. Strip, terminate, and paint mark the conductors into the EV− and EV+ terminals (Figure 18 callout 3 and Table 2). GM Energy V2H Bundle Installation Manual...
  • Page 28 DC Power EV− Black 1 Black EV− Black Circuit* 0.75″ Table 2 *CANH / CANL, and DC Backup Power Circuit EV+ / EV− are in opposite positions at the Charger with respect to the Inverter! GM Energy V2H Bundle Installation Manual...
  • Page 29: Set Charger Rating

    WARNING! Using a charge level that exceeds the electrical circuit or electrical outlet capacity may start a fire or damage the electrical circuit. Ensure DIP switch settings align to Charger amperage and breaker amperage. GM Energy V2H Bundle Installation Manual...
  • Page 30 Max. AC Pin Configuration Example Circuit breaker output amps 0A (default) Table 3 GM Energy V2H Bundle Installation Manual...
  • Page 31: Changing Output Current After Initial Setup

    If the output current setting is changed without reverting to factory default setting, the LED turns to blinking red once the Charger is powered back up, and the Charger will not charge. The alarm code will be displayed as EV4299, which can be checked in the commissioning app. GM Energy V2H Bundle Installation Manual...
  • Page 32: Charger Led Behavior

    OFF (open) position! If there is no rapid shutdown (RSD) switch installed, ensure that RSD 1 and RSD 2 are jumpered together (Figure 21, callout 5 and callout 9). GM Energy V2H Bundle Installation Manual...
  • Page 33 Figure 21: Inverter wiring locations * See https://gmenergy.gm.com/home/resources-and-support for availability **For systems without an RSD, connect the RSD terminals with a jumper as shown in callout 5 GM Energy V2H Bundle Installation Manual...
  • Page 34 GND Black GND Black @Inverter 1 Black DSB: @DSB: 0.6″ 1 Red +12V Factory wire connection. Comm (factory stripped) 1 Green GND Black Add cable gland or raceway 1 White A Green fitting. B White GM Energy V2H Bundle Installation Manual...
  • Page 35: Wire The Charger Connections

    (recommended), terminate, torque; and then paint mark the green wire to the grounding point (Figure 22 and Table 6; see also Figure 18 and Figure 21): Figure 22: Inverter-Charger connections GM Energy V2H Bundle Installation Manual...
  • Page 36: Wire The Ac Output Connections

    AC disconnect, appropriately terminate the output wires on the 60 A breaker in the Hub backup pan. Wire the Low-Voltage DC Circuits You should have already routed the #10 AWG red and black conductors from the Charger and the Hub, as well as the cabled conductors from the dark start. GM Energy V2H Bundle Installation Manual...
  • Page 37: Wire The Comm And Control Wires

    MID terminals: the A1/B1 wires and A2/B2 wires from the Hub must be twisted pairs. The single red SYN wire is required for direct grid feedback from the Hub to the Inverter in the system (Figure 27, Figure 21 callout 8, and Table 5): GM Energy V2H Bundle Installation Manual...
  • Page 38: Wire The Rsd Switch

    Inverter is operating normally (is converting power). BLINKING (1 second on / 1 second off) Fault is present in Dark Start or in PowerBank. Yellow BLINKING (1 second on / 4 seconds off) Inverter warning. GM Energy V2H Bundle Installation Manual...
  • Page 39 SOLID Arc fault is present. Table 9 The Inverter reset button (see Figure 21) has the following function (Table 10): Function Action Arc reset Press for 5 seconds to clear arc fault. Table 10 GM Energy V2H Bundle Installation Manual...
  • Page 40: Wire The Hub

    Wire the Hub Figure 29: Home Hub wiring locations GM Energy V2H Bundle Installation Manual...
  • Page 41 20 for #14–10 main, a large, and a small lug 110 for #6–4 25 for #8–4 size; but Ground bar lacks a 150 for #3–2/0 Strip length 0.55” main. Strip length 0.55” Table 11 GM Energy V2H Bundle Installation Manual...
  • Page 42 Charger amps rating (set via DIP switches in Charger). Maximum is 2 AWG for 80 A rating. Allow for sufficient clearance when routing wires near Home Hub dead front cover hinge locations. Figure 30: Callout for Home Hub hinge keep out zone GM Energy V2H Bundle Installation Manual...
  • Page 43: Hub-Inverter Power Wire Connection

    (large) • 150 / 17 for #3–2/0 AWG • 20 / 2.3 for #14–10 AWG Neutral and ground 5 mm 14–4 0.55” lug (small) slotted • 25 / 2.8 for #8–4 AWG Table 12 GM Energy V2H Bundle Installation Manual...
  • Page 44: Communication Wire Connection

    1. For RS-485 A1, B1, A2, and B2, use provided 14 AWG wire and strip 3/8″ from the wire ends. 2. For 12V and GND, use provided 14 AWG and strip 3/8″ from the wire ends. GM Energy V2H Bundle Installation Manual...
  • Page 45: Wire The Dark Start

    Torque if not Type Qty. Color Label Size terminal @Inverter: 1 Black Lever attachment on GND Black Green @Dark Start: Comm Inverter side (no torque Green 1 White N/A (integrated) required). B White +12V Table 13 GM Energy V2H Bundle Installation Manual...
  • Page 46: Install Covers

    Install the front cover* and torque the two M4 x 9 mm Torx screws to 10.4 in-lb. *Additional force on top corners of beauty cover may be required for proper fit onto Inverter box. GM Energy V2H Bundle Installation Manual...
  • Page 47: Testing And Commissioning

    GM Energy recommends printing the System & Voltage Checks, found in Appendix G. After all elements of the system installation are verified, and after commissioning is complete and system operation is verified (for example, the RSD switch operation has been verified), take a photograph of the completed sheet for job closeout records, and then fold it up and place it inside the Hub front cover before closing and sealing the Hub door.
  • Page 48: Verify Communications And Low-Voltage Wiring

    Establish safe working zones and don PPE. Systematically energize the utility service to MSP/main breaker, premises circuits, and Charger. For installations that include the Charger and V2H Bundle, energize the Hub and the Inverter, and each circuit in the Hub.
  • Page 49: Reinstall Covers

    Commissioning, Device Replacement, and Maintenance This section walks you through the steps to commission or perform maintenance on a GM Energy V2H Bundle. Before beginning this process, please ensure you have completed all necessary steps documented above in this manual.
  • Page 50 If the Charger’s indicator LED is red, this indicates that the DIP switch has not been configured. Please set the DIP switch before proceeding. Reference the “Set Charger Rating” for further instructions. LED - Blinking green GM Energy V2H Bundle Installation Manual...
  • Page 51 Commissioning Process App flow Please refer to the flow below for expected commissioning steps. Workflow List of App pages GM Energy V2H Bundle Installation Manual...
  • Page 52 Navigate to the GM Energy installer website. https://euss-prod.musea2.azure.ext.gm.com If you are commissioning the equipment for the first time or performing maintenance, you will need to set up an account and agree to the terms and conditions.
  • Page 53 Sign in using user credentials. If you do not have an existing account, follow the prompt to create a new account. Each installer must create their own GM account; this is separate from the customer’s account. Read the Terms and Conditions. In order to proceed, you must accept these.
  • Page 54 A Verification code will be generated. Copy the code as instructed. Return to the PowerShift Install app. Paste the code and click login. GM Energy V2H Bundle Installation Manual...
  • Page 55 SYSTEM COMMISSIONING Steps Select “Commission new device” Select “New EVSE” if installing a new Charger without the GM Energy V2H Bundle Select “New EVSE+BDI+MID+DSB” if installing the GM Energy V2H Bundle Select “Add BDI+MID+DSB” if installing the GM Energy V2H Enablement Kit with an existing GM Energy PowerShift Charger already previously installed and commissioned.
  • Page 56 If EVSE is within range of the same Wi-Fi network, then select “Same as MID’s Wi-Fi Router info”, if not, scan for other network and input separate credentials for that secondary network. Click SET to proceed to the next step GM Energy V2H Bundle Installation Manual...
  • Page 57 -DC1, BDI, and EVSE. Please do not close the app during the FW update(s). These may take up to 15 minutes. The following message should pop up once the Update is complete. GM Energy V2H Bundle Installation Manual...
  • Page 58 Red text will display with the type of error in the connectivity of the system if disconnected due to a fault. Please go to maintenance section of network settings and try to connect the system again. If further issues occur call GM Energy Customer Support Center at 1-833-64POWER Confirm BDI Setup: Status: Confirm status is not in alarm or fault Standby Mode: Default is off.
  • Page 59 If any questions on how to troubleshoot a fault, please call GM Energy Customer Support Center at 1-833-64POWER Confirm EVSE setup: EVSE Voltage, Current, Power: Confirm accurate values HW Dip Switch: Confirm this is reading the proper value set Current Event: EV0000 is an acceptable event code. If any other event code is present, you can go to “Event History”...
  • Page 60 Note: Customer must setup EV discharge settings in their vehicle mobile app (myChevrolet, myBuick, myGMC or myCadillac). Discharge requirements can be found in the customers GM Energy user guide available at the following website: https://gmenergy.gm.com/for-home/resources-and-support. CHANGE DEVICE This function will be used in the event that a component of the system is replaced.
  • Page 61 For EVSE only replacements (No GM Energy V2H Bundle), the following screen will appear. Please enter the serial number of the prior EVSE which has now been replaced. The previous EVSE should be uninstalled and the new EVSE should be connected, fully installed, and ready to be commissioned at this step.
  • Page 62 QR code or type in the serial number to continue. Note: Only the EVSE and MID have QR codes. If replacing a BDI or DSB, you must scan the MID, as instructed, to connect to the system GM Energy V2H Bundle Installation Manual...
  • Page 63 Confirm Old Serial number and New Serial numbers are accurate. Click SET to continue For GM Energy V2H Bundles, all settings are saved in the MID, therefore replacing the BDI, DSB or EVSE requires no additional setting requirements. You can still edit settings as needed by going into the maintenance portion of this app.
  • Page 64 (myChevrolet, myBuick, myGMC or myCadillac) to connect their hardware to their home Wi-Fi router to regain internet connectivity to their hardware. GM Energy V2H Bundle Installation Manual...
  • Page 65 Click Refresh to search for most recent FW updates. Select device(s) requiring updates and Start Upgrade. Note: DC1 refers to the datalogging module in the MID. The following message should pop up once the Update is complete. GM Energy V2H Bundle Installation Manual...
  • Page 66 Red text will display with the type of error in the connectivity of the system if disconnected due to a fault. Please go to maintenance section of network settings and try to connect the system again. If further issues occur call GM Energy Customer Support Center at 1-833-64POWER Confirm BDI Setup: Status: Confirm status is not in alarm or fault Standby Mode: Default is off.
  • Page 67 Nominal Voltage and Utility Code: Confirm previous selections from BDI setup If any questions on how to troubleshoot a fault, please call GM Energy Customer Support Center at 1-833-64POWER Confirm EVSE setup: EVSE Voltage, Current, Power: Confirm accurate values HW Dip Switch: Confirm this is reading the proper value set Current Event: EV0000 is an acceptable event code.
  • Page 68 Discharging: Attempt a discharge by flipping the main circuit breaker. Note: Customer must setup EV discharge settings in their vehicle mobile app (myChevrolet, myBuick, myGMC or myCadillac). Discharge requirements can be found in the customers GM Energy user guide available at the following website: https://gmenergy.gm.com/for-home/resources-and-support...
  • Page 69 This allows the user to monitor device properties and alter device settings Select “EVSE” if viewing settings for an EVSE-only system Select “MID” if viewing GM Energy V2H Bundle settings Note: Direct BDI connections are not needed for standard maintenance Select target device.
  • Page 70 Monitor the connection status of device and internet. - Notes (1) The connected device will display green (2) The disconnected device will display gray System Status: Monitor real-time system values of connected devices or any event codes (faults, errors, etc.). GM Energy V2H Bundle Installation Manual...
  • Page 71 Network Setting Manage device internet network settings Event History Show the event history by device or event type (Fault, Error, Warning, etc.) GM Energy V2H Bundle Installation Manual...
  • Page 72 PTO; requirements may vary by system setup and AHJ/utility. Firmware Upgrade Monitor and upgrade device firmware versions. Click “Refresh” to search for recent Firmware versions. Select the device(s) requiring an upgrade and “Start Upgrade”. GM Energy V2H Bundle Installation Manual...
  • Page 73 Reset MID. If a system was already commissioned and this action needs to be performed, please contact GM Energy Support Center at 1-833-64POWER before completing this action. Factory reset device to default settings. This process will delete all configuration settings previously installed on the target device.
  • Page 74 Note: If an MID reset occurs, the user must re-commission the system to the appropriate settings before leaving the site. Back to Startup Click “Yes” to exit the Maintenance menu and return to the Home screen. GM Energy V2H Bundle Installation Manual...
  • Page 75: Job Closeout

    Job Closeout Remove and discard the protective film from the Charger. For installations that include the Charger and V2H Bundle, it is recommended to complete the System & Voltage Checks Form, available in GM Energy V2H Bundle Installation Manual...
  • Page 76 Hub front cover before closing and sealing the Hub door. Additionally, GM Energy recommends taking the following photos for your closeout record. Be aware, certain photos can only be taken mid-install, as noted below;...
  • Page 77 Verify ground bonding strap (if installed), and Capture additional CT configurations if grounding terminations and torque. applicable. Verify PCB wiring connections. Verify non-factory wiring workmanship (field wiring). Verify consumption CTs orientation. Verify conduit entry and wiring workmanship. GM Energy V2H Bundle Installation Manual...
  • Page 78 Verify water egress method and conduit drain fitting. Charger breaker in MSP Verify breaker and DIP switch settings are correct. Verify rating setting. Charger enclosure label (showing rating setting) GM Energy V2H Bundle Installation Manual...
  • Page 79 Verify systems checks completed. System & Voltage Checks form (completely filled out) As-built documentation for records. GM Energy PowerShift Install app device info Confirm correct amperage and CT functionality. screen(s) Be sure to scroll down and capture info on each device as applicable. Multiple screenshots may be required.
  • Page 80: Appendix A: Product Datasheets

    APPENDIX A: PRODUCT DATASHEETS Please refer to GM Energy website for product data sheets at https://gmenergy.gm.com/for-home/resources-and-support APPENDIX B: DESIGN GUIDELINES Determine Charger breaker size: • If available, use Green Button data/usage data to size Charger breaker as large as possible without triggering a main panel upgrade (MPU).
  • Page 81 3rd Party Generator Compatibility At the time of this manual publishing date, GM Energy does not allow the installation of the V2H Enablement Kit with new or existing backup generators. Violation of this policy impacts the GM Energy limited warranty and may result in damage to generators and/or V2H equipment.
  • Page 82: Appendix C: Accessories

    Note: The RSD must be assembled in an outdoor-rated enclosure, visible at point of interconnection to clearly indicate ON and OFF positions, and be labeled appropriately. See Section 2.5. Non-backup breaker pan, 48INT125B: https://www.eaton.com/us/en-us/skuPage.48INT125B.html https://www.platt.com/p/0847536/eaton/oem-br-loadcenter- interior/786679094136/cut48int125b GM Energy V2H Bundle Installation Manual...
  • Page 83 600 V rated communications cable (required if sharing raceway): https://www.belden.com/products/Cable/Tray-TC-Cable/3088A (1 pair) https://www.belden.com/products/cable/tray-tc-cable/1048a (2 pair) https://www.digikey.com/en/products/detail/belden-inc/3088A- 01010000/8122257?s=N4IgTCBcDaIMwAYAcSCCIC6BfIA https://www.digikey.com/en/products/detail/belden-inc/1048A- 0107500/8122194?s=N4IgTCBcDaIIwAYAsAOAgiAugXyA GM Energy V2H Bundle Installation Manual...
  • Page 84: Appendix D: Electrical Diagrams

    80% the Inverter stops providing power. The main breaker capacity must be set in the commissioning app properly for this setup. Commissioning App Busbar Settings Input CT location CT at Grid Meter Main breaker capacity 0 - 200 A GM Energy V2H Bundle Installation Manual...
  • Page 85 When the meter cannot be placed at the grid connection (preferred setup due to customer app displays) the PCS meter can be put on the output of the MID as an alternative and left in the factory-installed location. An export limit must be calculated and set in the commissioning app for this setup. GM Energy V2H Bundle Installation Manual...
  • Page 86 If a meter is not possible to be placed at the grid or at the MID, the installer can calculate and input a single source output limit for the Inverter. Commissioning App Busbar Setting Input Single source output CT location 0 - 48 A Inverter Limit Current Default can be set to 0 A GM Energy V2H Bundle Installation Manual...
  • Page 87 Perform the following calculation for this input: 1.2 x Busbar Capacity – Main Breaker Rating – AC Solar Export Limit Current Rating (Default can be set to 0 A for V2H Installs) AC Solar Enabled GM Energy V2H Bundle Installation Manual...
  • Page 88 Perform the following calculation for this input: Export Limit Current 1.2 x Busbar Capacity – Main Breaker Rating – AC Solar Rating (Default can be set to 0 A for V2H Installs) AC Solar Enabled GM Energy V2H Bundle Installation Manual...
  • Page 89: Appendix E: Operation And Maintenance

    If one is present, activate the Rapid Shutdown Device (RSD). Doing so will place all the V2H Bundle equipment in standby. Perform the following in the order presented:...
  • Page 90: Charger

    For some of the procedures in this appendix, the customer’s vehicle will be required to fully test and verify the replacement process. Recommissioning using the PowerShift Install application, verifying operation of the full V2H Bundle, and verification of continuity for the backup circuits are also required.
  • Page 91: V2H Enablement Kit Components (Inverter, Hub, And Dark Start)

    Ship the defective component back to the supplier using the original shipping box and return label provided. Inform the homeowner of the work performed and of any next steps. APPENDIX F: TROUBLESHOOTING Troubleshooting information is available at https://gmenergy.gm.com/for-home/resources-and-support For additional Troubleshooting, call the GM Energy Support Center at 1-833-64POWER. GM Energy V2H Bundle Installation Manual...
  • Page 92: Appendix G: Exploded View

    APPENDIX G: EXPLODED VIEW These diagrams show the individual parts of the Charger, Inverter and the Hub. Charger Inverter GM Energy V2H Bundle Installation Manual...
  • Page 93 GM Energy V2H Bundle Installation Manual...
  • Page 94 APPENDIX H: SYSTEM & VOLTAGE CHECKS FORM Print the System & Voltage Checks form, ensure that all values and markings are recorded on the it, and then fold it and place it inside the Hub case cover: GM Energy V2H Bundle Installation Manual...
  • Page 95 Inverter to avoid exceeding generation backfeed current limits. Option available when "CT at Grid" meter selected. Main breaker capacity This value represents the amperage of the main breaker feeding the MSP. Typical values range: 100A, 125A, 150A, 200A GM Energy V2H Bundle Installation Manual...
  • Page 96 Check this box if this system has existing AC solar. The second meter (CT 2) will be placed to read the total output from this power source. AC Solar Enabled Refer to Appendix D: Electrical Diagrams for various installation setups and recommended CT location settings GM Energy V2H Bundle Installation Manual...

Table of Contents

Save PDF