Haier HHS-1X5K User Manual
Haier HHS-1X5K User Manual

Haier HHS-1X5K User Manual

Battery energy storage system

Advertisement

Quick Links

User manual
Battery energy storage system
HHS-1X5K
HHS-1X10K
HHS-1X15K
HHS-1X20K
Version 1.0

Advertisement

Table of Contents
loading

Summary of Contents for Haier HHS-1X5K

  • Page 1 User manual Battery energy storage system HHS-1X5K HHS-1X10K HHS-1X15K HHS-1X20K Version 1.0...
  • Page 3: Table Of Contents

    Grounding instructions ....................19 Power connector installation ..................20 Cable connection ......................21 4.3.1 Single HHS-1X5K/10K/15K/20K system.............. 21 4.3.2 Multiple HHS-1X5K/10K/15K/20K in parallel ............. 22 5 Power up your system ....................... 23 System power up ......................23 System power off ......................24 Display description......................
  • Page 4: Safety Precaution

    1 Safety precaution Read the manual carefully and operate in accordance with the safety precautions. Refer to local safety regulations on items not covered in this manual. Electrical installation, maintenance must be performed by professional / qualified personnel. 1.1 Storage and installation environment ...
  • Page 5: Emergency Handling

    Warning Protective Earth High Voltage (general identification) 5 min Wait 5 min till fully discharged Do not short circuit Keep away from children (cut off power) Fragile Do not get wet 1.4 Emergency handling Wear personal protective equipment (PPE) such as goggle, facemask, insulated gloves and boots. Evaluate the situation before taking remedy action.
  • Page 6: Product Description

    2 Product description HHS-1X(5/10/15/20)K is a plug-in energy storage system consisting of battery module B051100P03-H and control box H0K6050P03-H. The battery module can convert high voltage direct current (HVDC) into low voltage direct current (LVDC) through DC to DC conversion inside the battery and stores the power in batteries, it can also convert LVDC into HVDC and send the power to the grid through the inverter.
  • Page 7: Appearance Description

    20kWh 15kWh 10kWh 5kWh Figure 2-1-1 HHS-1X5K/10K/15K/20K configurations 2.2 Appearance description  Appearance of the whole system ① PCS/INVERTER ② ③ Figure 2-2-1 Appearance of the whole machine ① Control module ② Battery module ③ Mounting the base...
  • Page 8  Control module ① ③ ④ ② Figure 2-2-2 Left side of control module ①Power button ② DC breaker ③ Wi-Fi antenna ④ display ② ① ③ ⑤ ⑥ ④ ⑥ ⑦ Figure 2-2-3 Right side of the control module ①...
  • Page 9: Installation Guide

     Keep away from heating device.  Prevent from corrosive chemicals  Prevent from water spillage  Consider location equipped with ventilation fans, smoke, heat, or flammable gas detector HHS-1X5K/10K/15K/20K performance degrades when ambient temperature is below 10℃(50℉) or above 40℃(104℉) degrees.
  • Page 10 Installation physical requirements a. Item inspection b. Installation clearance ≥600mm(24in) ≥600mm(24in) ≥600mm(24in) ≥600mm (24in) ≥915mm(36in) ≥915mm(36in) ≥1000mm(39.37in) c. Level control ∠0-3° ∠>3° (20in) (20in) Wall Wall Battery Battery ∠0-3° ∠>3° (20in) (20in) Floor Floor (20in) (20in)...
  • Page 11: Installation

    d. L-bracket fixing bolt positioning Take into account the actual surface condition before fixing the L-bracket: the bolt spacing is 406 mm (16 inches) for the inner ones and 508mm (20 inches) for the outer ones, as illustrated below. 508mm(20inches) Wall 406mm(16inches)...
  • Page 12: Packaging Components

    Safety gloves Safety goggles Dust mask Safety shoes 3.3.2 Packaging components Battery Module Packaging Components Screw cover Fixing screws Battery module (M5*12) X4 Control Module Packaging Components Fixing screws L-bracket X4(max) (M5*12) X12(max) Base X1 Control module X1 Expansion screw Self-tapping screws M6*18*2large flat pad Grounding Terminals...
  • Page 13: Installation Steps

    Cable kit Packaging Components PCS-RS485/CAN Negative wire harness Positive wire harness 120ohm resistance communication cable X1 3.3 Installation steps a. Place the base Take the control module and base module out of the carton and put them side by side. The base module should be placed on a level ground, parallel to the wall.
  • Page 14 Refer to the following for the recommended the wall mounting assembly (angle bracket + L-bracket) installation: 1 mounting assembly on 1 mounting assembly on 2 pcs mounting assembly on 2 pcs mounting assembly on Batt. No.1 Batt. No.2 Batt. No.2 Batt.
  • Page 15 Unit weights 50kg (110.2lbs). Two or more people are necessary. Align the connector side first, then stack gently to avoid damaging the connector! Fasten the installed battery module Fixing screw M5*12 4 pcs Screw cover plastic 4 pcs...
  • Page 16 d. Adding additional battery module Fasten the stacked battery module Fixing screw M5*12 4 pcs Screw cover plastic 4 pcs...
  • Page 17 e. Install L-bracket L-bracket 2 pcs ① Mark the screw position Place the L-shaped bracket against the wall on the L-bracket and mark the drilling point ② Drilling (for concrete or brick wall) and fixing the L-Bracket to the wall Use PE bag from the product packaging to prevent falling debris.
  • Page 18 Flange nut 2 pcs Case 2 for wooden wall Self-tapping screws M6*60 2 pcs 2 pcs Large flat pad Note: The self-tapping screw must penetrate the stake 38mm. 1, Use M6*60 2pcs self-tapping screws to drill directly into the stake. 2, Use a 13/64 bit to pre-drill the holes if there are concrete wall partitions in front of the stakes.
  • Page 19 Stack additional battery modules (up to 4 battery modules in total) Fasten the stacked battery module Fixing screw M5*12 8 pcs Screw cover plastic 8 pcs g. The overall bracket completes the installation position arrangement HHS-1X5K/10K/15K/20K-5 HHS-1X5K/10K/15K/20K-10...
  • Page 20 Concrete wall Wooden wall Concrete wall Wooden wall HHS-1X5K/10K/15K/20K-15 HHS-1X5K/10K/15K/20K-20 Concrete wall Wooden wall Concrete wall Wooden wall h. Control module installation ①Fasten the stacked battery module Fixing screw M5*12 4 pcs Screw cover plastic 4 pcs...
  • Page 21 ② Check model Tick the nameplate model according to the number of installed battery modules: 5kWh: HHS-1X5K/10K/15K/20K-5 10kWh: HHS-1X5K/10K/15K/20K-10 15kWh:HHS-1X5K/10K/15K/20K-15 20kWh: HHS-1X5K/10K/15K/20K-20...
  • Page 22: Electrical Connections

    Installation acomplish 4 Electrical connections Do not power on the system during electrical connection. 4.1 Grounding instructions The recommended grounding cable specifications are as follows. Ground cable 10AWG (yellow-green) Ring terminal Screw...
  • Page 23: Power Connector Installation

    Figure 4-1-1 Schematic diagram of equipment grounding 4.2 Power connector installation...
  • Page 24: Cable Connection

    4.3 Cable connection 4.3.1 Single HHS-1X5K/10K/15K/20K system Refer to user manual for inverter connection. ③ ① ② ③ ① ② ④ Figure 4-3-1 Wiring diagram of single machine system Harness name Cable mark ① Positive wire harness DC+ PCS/BAT+ ②...
  • Page 25: Multiple Hhs-1X5K/10K/15K/20K In Parallel

    Wakeup- 4.3.2 Multiple HHS-1X5K/10K/15K/20K in parallel Up to 3 pcs HHS-1X5K/10K/15K/20K can be connected in parallel. The power conductor of the combined HHS-1X5K/10K/15K/20K output shall be according to the total current rated. Consider using a distribution box when combining positive and negative output from multiple HHS-1X5K/10K/15K/20K as illustrated below.
  • Page 26: Power Up Your System

    For inverter communication, only the CAN/RS485 on the mater unit needs to be connected. Communication between HHS-1X5K/10K/15K/20K is by connecting COM0 (slave-side) to COM1 (master-side) as illustrated below. Figure 4-3-2b Communication wiring of multiple system 5 Power up your system Checked all connections thoroughly before proceeding.
  • Page 27: System Power Off

    ① ② ③ Note: Each cluster of battery systems in parallel system is powered on independently. 5.2 System power off  Turn off the battery switch on the inverter side① (if any) or make the inverter stop charging and discharging the battery. ...
  • Page 28: System Configuration

    Table 5-3-1 Display Item Description Function ① Digital display of real-time state of charge (SOC) ② [Constant on] discharging / idling, lit-up blue bar shows SOC. [Flashing] charging (last bar in counterclockwise direction) ③ System status [Constant on] normal [Flashing] system fault ④...
  • Page 29 module) ①Click "SmartConfig", ②Select the Bluetooth device corresponding to the battery, ③Enter the WiFi network account and WiFi password, ④Click "SmartConfig" to complete the networking, the APP displays the successful network configuration information and the WiFi icon on the display is always on, that is, the network configuration is completed. ③...
  • Page 30: Maintenance And Troubleshooting

    Default INV-01 INV-02 Goodwe ET INV-03 INV-04 INV-05 INV-06 Haier HV INV-07 INV-08 INV-09 INV-10 6 Maintenance and troubleshooting 6.1 Routine maintenance  Maintenance charge every 6 months From the date of manufacturer shipment, the battery shall be maintained every 6 months. Action must be taken in case SOC reaches 0%.
  • Page 31: Fault Checklist

     Check the battery system regularly. Contact your support if any anomaly detected. 6.2 Fault checklist Fault Cause Solution 1.Please try restarting the battery, No voltage output when power on, 1. Press the key for less than 3s Press the key for more than 3s and the key light is not on 2.
  • Page 32 3. If the ventilation and ambient temperature are normal,please contact the supplier for more information 1. Check whether the ambient temperature exceeds the minimum 1. The product installation allowable charging temperature Battery module charging low environment is too low range. If the ambient temperature is temperature protection 2.
  • Page 33: Warehouse Storage Guidelines

    display is abnormal and blinks view the fault information and every 1S contact the supplier The heater works abnormally, and Log in to the PowerLite APP to the heating status indicator on the Heating circuit failure view the fault information and display flashes every 1S contact the supplier 1.Check whether the paired...
  • Page 34: Storage

    Regular cleaning of the battery system is recommended. If the case is dirty, use a soft dry brush or dust collector to remove the dust. Cleaning liquid materials include solvents, abrasives, etc. Corrosive liquids should not be used to clean the housing. Packaging step Battery pack Control box...
  • Page 35 Max. current Battery module model B40012DP03-H Cell Type Rated Voltage 400V, with DC-DC power module built-in Rated energy 5kWh Group method 16S1P Rated Capacity HHS-1X5K HHS-1X10K HHS-1X15K HHS-1X20K No. of batt. module Rated energy 5kWh 10kWh 15kWh 20kWh Rated power 2.5kW...
  • Page 36 Manufacturer: Qingdao Nahui Energy Technology Co., Ltd. Adress:Room303, Entrance 1, No.4 Building, Lan Gu Entrepreneurship Center Phase 1, No. 7, Keji Yilu Road, Aoshanwei Sub district Office, Jimo District, Qingdao, Shandong...

This manual is also suitable for:

Hhs-1x10kHhs-1x15kHhs-1x20k

Table of Contents