TWG-ⅡA-P Roll Grooving Machine User’s Manual Familiar yourself with this Manual prior to operation Tuwei Construction Equipment Manufacturing Co., Ltd, People’s Republic of China...
I. Major applications and scope This machine is applicable for forming circular channel at the end of seamless steel tubing, galvanized pipes, plastic-lining pipes and stainless steel pipes etc, to facilitate the mounting of circular pipe clamps. It’s an ideal tool for construction industry and pipeline construction sectors.
IV. Driving System The major moving unit of this machine consists of a rotating spindle directly driven by a reduction motor, resulting in a reduced loss of mechanic power. The feeding movement is realized by manual hydraulic system. V. Electric System Fig.2 Electric Circuit Diagram Consist of an electric motor, a Footswitch,a contractor and cables.
VI. Operation and Adjustment 1. According to Fig.3 install 4 brackets into 4 holes of base separately in an upward direction and then tighten. 2. Let the machine run idle to check whether it’s normal. 3. Place the steel tubes on the knurl wheel and bracket. Turn the handle (see Fig. 3) to vary the height of bracket, so that the steel tube and spindle are parallel.
Page 8
handle to let the pinch roller roll at the original position for 1-2 turns before opening the relief valve to allow the pinch roller leave the pipe. The above procedure shall occur while the machine is kept on. 7.Remove the filler plug (Fig.6 ) to add hydraulic oil(loosen the relief valve, remove all the dusts near the filler aperture).Use 20# hydraulic oil in Summer and 10# inWinter.
Page 10
10..For the replacement of pinch roller, you shall return the pinch roller holder to the highest positionand remove the tighten screws (Fig.15),before pulling out the pinch roller shaft while holding the roller with your hand, install new pinch roller. For the relocating of pinch roller, you shall loosen 2 hexagonal bolts (Fig.16) on the slide and turn the adjustment bolts to move the pinch roller forward/backward.
Page 11
12..In case of steel pipes of large diameter (above Φ 165 mm) to be channeled, the pipe may swing violently Fig .13 in the process of channeling due to irregularity and a poor channeling or even failure may be resulted. To solve this problem, we particularly supply an optional jockey roller which can be moved to touch the steel pipe by turning the handwheel and screw...
Page 12
Fig .14 Fig .17 (form 1) Diameter of Model Model of Nominal Actual A± B± C± Groove Bottom Of pinch knurl Pipe Pipe roller wheel Dia.(inch) Dia.(mm) (mm) (mm) (mm) Max.(mm) Min.(mm) Small 2” 15.88 8.74 1.65 57.15 56.77 Knurl 2-1/2”...
8” 19.05 11.91 2.34 214.40 213.76 Large Large Pinch Knurl 10” 19.05 11.91 2.39 268.28 267.59 roller wheel 12” 19.05 11.91 2.77 318.29 317.53 VII. Precautions The operator is required to read this Manual in details to be familiar with the structure, buttons , handles, driving and lubricating systems of the machine prior to operation.
Page 14
This mark indicates the operator may have risks of injury and even death due to improper operation. Notice! This mark indicates contents which the operator shall observe. Otherwise, unexpected results or even human injury may be produced. 2. General Notices 2.1 The operators shall observe in-house safety rules .
Page 15
refilled with grease each shift respectively, after removing the dusts around the orifice. 3. Safety protective measures on electric control system An earthing wire and a proper fuse are required in th power line . The voltage and frequency of motor shall be consistent with the power supply.; Overload running shall be avoided.
Troubleshooting VIII. Problem Causes Solutions 1. Insufficient Add hydraulic oil. hydraulic oil. No pressure in the oil cylinder. 2. Dirt oil blocks the Replace the hydraulic oil, clean No action resulted from turning hole. the oil net. the handle. Remove the screws and spring. 3.
Page 17
1. Improper direction Vary the direction and height of and height of bracket. bracket. Toggle the clock-wise / The pipe escapes 2. Improper direction anti-clockwise switch to change of steel pipe the rotation direction of spindle 3. Rough end face of Grind the end face.
Page 18
IX. The assembly drawing of roll grooving machine and parts form Fig .18...
Page 31
4. Bracket parts form (Fig.22) Code name Name Material GB/T 5781-2000 Hexagonal bolt M10x25 GB93-87 Spring washer 10 GB97.1-2002 Flat washer A level 10 TWG/2A-05-005 Triangle bracket Jointing assembled TWG/2A-05-008(1) Stopping block A TWG/2A-05-009 Bracket pipe HT200 TWG/2A-05-007 Guide column Jointing assembled GB/T 70.1-2000 Hexangular bolt M8x20...
Page 32
1. Our company reserves the authority of changing the products and specification, if any alteration we don't inform specially. 2. Difference between the picture and the object, please be subject to the object. Tuwei Construction Equipment Manufacturing Co., Ltd, Add: No.31 Kangzhuang Road,Western industry zone,Huangyan,Taizhou, Zhejiang,China Tel:0086-576-84715288 84715290 Fax:0086-576-84715289...