Basic commissioning

6.1

Preparing basic commissioning

Prerequisites: before you start
Before starting commissioning, you must answer the following questions:
● What data does my converter have?
● What is the data for the connected motor?
● What technological requirements must the drive fulfill?
● Via which converter interfaces does the higher-level control operate the drive?
6.1.1

Collecting motor data

In which region of the world is the motor used?
● Europe IEC: 50 Hz [kW]
● North America NEMA: 60 Hz [hp] or 60 Hz [kW]
Motor data of the rating plate
If you use the STARTER commissioning tool and a SIEMENS motor, then you only have to
specify the order number of the motor - otherwise you must use the data from the motor
rating plate.
SINAMICS G120C frequency converter
Operating Instructions, 03/2012, FW V4.5, A5E02999804B AB
3~Mot
1LA7130-4AA10
No UD 0013509-0090-0031
TICI F 1325 IP 55 IM B3
50 Hz
230/400 V
5.5 kW
19.7/11.4 A
Cos φ 0.81
1455 1/min
220-240/380-420 V
19.7-20.6/11.4-11.9 A
EN 60034
60 Hz
460 V
6.5 kW
10.9 A
Cos φ 0.82
1755 1/min
440-480 V
95.75 %
45 kg
11.1-11.3 A
6
51