Download Print this page

COSNET RTF Assembly Sheet page 3

Advertisement

IMPORTANT: Firmly tighten all of the screws from the previous assembly
steps.
ASSEMBLY SHEET:
RTF & RTLS & RTO & RTC
6. Fitting the clevises
Fit the 4 clevises with the 8 10x70 rectangular head bolts
with nuts
+ 8 M10 washers
+ 8 M10 locknuts
7. Assembling the panels
2 m x 2 m hay rack: 1 opening panel + 2 fixed panels.
Mount the fixed panels using M14x100 hex head screws in the
4 clevises.
For the opening panel:
Choose the direction of opening, left or right. Then mount the
panel using the M14x100 hex head screws on the hinge side
and using the eyebolts with chains on the other side.
NOTE: For the 3-head yoke gate, the direction of opening
must be on the hinge on the handle side.
8. Fastening the runners
Raise the hay rack and fit the runners to the desired height
(3 options), then secure them with M10x60 hex head screws.
10109
Page 3/4
20171017

Advertisement

loading
Need help?

Need help?

Do you have a question about the RTF and is the answer not in the manual?

Questions and answers

This manual is also suitable for:

RtlsRtoRtc