Download Print this page

Siemens PAL-1 Installation Instructions Manual

Parallel printer

Advertisement

Quick Links

Installation Instructions
Model PAL-1
Parallel Printer
Operation
The model PAL-1 from Siemens Industry, Inc. allows the connection
of an ITE Centronics parallel printer to the Siemens FireFinder-XLS/
Desigo Fire Safety Modular/Cerberus PRO Modular, MXL,
FireFinder-NCC, FC2025, FC2050, FC922, FC924, Desigo CC
and Cerberus DMS systems. See the manufacturer's installation
manual for self diagnostics.
The PAL-1 printer can be used with control panel models XLS/Desigo
Fire Safety Modular/Cerberus PRO Modular, FC2025, FC2050, FC922,
FC924, NCC, Desigo CC, and Cerberus DMS Management Systems in
UL864 and ULC-S527 installations. The PAL-1 printer can be used in UL2572 installations, Control and
Communication Units for Mass Notification. For supplementary use only, the NCC and PAL-1 may be con-
nected to the UL1076 approved XLS/Desigo Fire Safety Modular/Cerberus PRO Modular and MXL control
panels.
Use UL/ULC Listed surge protector Ditek model DTK-8FF.
Installation
UPS Standby Power
The PAL-1 printer requires a standby power source in the event of the loss of primary input power (AC
mains). Refer to Figure 2 for the connection of a UPS to meet this requirement.
TO TRI-60/B6/S OR HTRI-S/-D/-R INPUT
TERMINALS. PROGRAM AS NORMALLY OPEN
TROUBLE CAUSING INPUT IN CSG-M (AccuLINK)
OR ZEUS AND FPI-32 OR DPU, AS APPLICABLE.
REFER TO TRI-60 INSTALLATION INSTRUCTIONS,
P/N 315-092329, THE TRI-B6 INSTALLATION
INSTRUCTIONS, P/N 315-093315,
INSTALLATION INSTRUCTIONS, P/N 315-096242 OR
315-049481,
INSTRUCTIONS, P/N 315-033300 OR 315-049075,
TERMINAL BLOCK
LOCATED ON
UPS SYSTEM
CONTROL BOARD
NOTES:
1. All wires 14 AWG min, 600V insulation.
2. Wiring to the printer and must be 14 AWG min., 600V insulation in conduit, and located in the same room as the
control panel.
3. Use the UPS ICS Lifeline Model 9300057.
4. Standby Power requirements: 120 VAC, 3A for 24 hours.
P/N 315-092408-AT
120 VAC
OR THE TRI-S
OR THE HTRI-S/-D/-R INSTALLATION
SOURCE
AS APPLICABLE.
1
2
3
4
5
6
NO
C
NC
NO
C
NC
1
H
AC
BATTERY
INPUT
FAIL
FAIL
120 VAC
UTILITY INPUT
Figure 2
UPS Wiring Diagram
POWER TO
UTILITY
PRINTER
DO NOT
POWER
120 VAC
USE
SEE NOTE 4
2
3
4
5
6
7
8
GND
N
H
N
H
GND
N
120 VAC
120 VAC
INPUT
OUTPUT OF
THE UPS
POWER
POWER
AFTER FILTER
Figure 1
PAL-1 Printer
DO NOT
USE
9
10
11
H
GND
N
Siemens
Siemens
Industry
Industry
Industry, , , , , Inc.
Siemens Industry
Siemens
Siemens
Industry
Smar
Smar
t Infrastruct
t Infrastruct
Smart Infrastruct
Smar
Smar
t Infrastruct
t Infrastructure
Inc.
Inc.
Inc.
Inc.
ure
ure
ure
ure

Advertisement

loading

Summary of Contents for Siemens PAL-1

  • Page 1 Installation UPS Standby Power The PAL-1 printer requires a standby power source in the event of the loss of primary input power (AC mains). Refer to Figure 2 for the connection of a UPS to meet this requirement. TO TRI-60/B6/S OR HTRI-S/-D/-R INPUT TERMINALS.
  • Page 2 NOTES: The maximum distance from the RPM to the PAL-1 is 6 feet. The two modules must be in the same room. Wiring to the printer must be 14 AWG min., 600V insulation in conduit, and located in the same room as the control panel.
  • Page 3 MXL System 1. Installation of the PAL-1 in an MXL system requires that a Siemens model ANN-2 or ANN-3 is installed in the system. The ANN-2 and ANN-3 come installed in an MKB-5 or MKB-6 respectively. An ANN-3 is also included in model RCC-3.
  • Page 4 NOTES: The maximum distance from the FCA2018-U1 to the PAL-1 is 6 feet. The two modules must be in the same room. Wiring to the printer must be 14 AWG min., 600V insulation in conduit, and located in the same room as the control panel.
  • Page 5: Electrical Ratings

    Siemens Building Management System (NCCXP-G or -GL, NCCI7-G or -GL, Desigo CC, and Cerberus DMS) 1. The PAL-1 can be used as a supervised journaling or logging printer when connected to a UL listed Siemens Building Management System computer to meet the requirements of an NFPA 72 proprietary system.
  • Page 6: Cyber Security Disclaimer

    In order to protect plants, systems, machines and networks against cyber threats, it is necessary to implement – and continuously maintain – a holistic, state-of-the-art security concept. Siemens’ portfolio only forms one element of such a concept. You are responsible for preventing unauthorized access to...
  • Page 7 This page has been left intentionally blank.
  • Page 8 Siemens Canada, Ltd. Siemens Industry, Inc. 1577 North Service Road East Smart Infrastructure Oakville, Ontario 8 Fernwood Road L6H 0H6 Canada Florham Park, NJ P/N 315-092408-AT Document ID A6V10372650...