Identification; Installation; Packing; Handling - Ferroli TP3 COND 65-1000 Instructions For Installation, Use And Maintenance Manual

Highly efficiency pressurized condensing boiler in steel
Table of Contents

Advertisement

Available languages

Available languages

TP3 COND

4.4 Identification

The boiler can be identified by means of:
• Bag documents
It is applied on one side and contains:
- TECHNICAL MANUAL
- WARRANTY CERTIFICATE
- LABELS WITH BAR CODES
• Data plate
It gives the technical data and performance of the unit.
It is applied in a visible place at the top of one of the casing side panels.
If lost, ask the FERROLI After-Sales Service for a duplicate.
Tampering, removal or lack of the identification plate prevents sure identification of the product, and makes any installation and maintenance
operation difficult.
5.

INSTALLATION

5.1 Packing

TP3 COND boilers are supplied inside wooden packing, complete with door, smoke chamber, insulation on the body and casing.
The instrument panel is supplied according to the equipment chosen by the user.

5.2 Handling

TP3 COND boilers have lifting hooks "A" (see fig. 3 and fig. 4). Be careful during handling, and use equipment suitable for the weight.
Before positioning the boiler, remove the wooden base by undoing the fixing screws (fig. 5).
fig. 3 - From model TP3 COND 65 to TP3 COND 230
fig. 4 - From model TP3 COND 370 to TP3 COND 1000
fig. 5 - Positioning
cod. 3541T740 - Rev 05 - 08/2022
59
EN

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the TP3 COND 65-1000 and is the answer not in the manual?

Questions and answers

Table of Contents