SolaX Power BMS Parallel Box-II G2 User Manual

SolaX Power BMS Parallel Box-II G2 User Manual

Advertisement

Quick Links

Description
REV.
REV.
首次发布
0.0
郑安琪
2023/09/20
修改所有涉及并联盒外观及端口细节的示意
图,连接T30&T58及逆变器的接线示意图。
0.1
修改丝印CAN为M-CAN/S-CAN。
郑安琪
2023/10/26
品名
说明书 BMS Parallel Box-Ⅱ G2 英文版 SolaX 01版
浙江艾罗网络能源技术股份有限公司
料号
320101064101
SolaX Power Network Technology (Zhejiang) Co., Ltd.
单位
页次
Description
技术要求:
1.封面封底157g铜版纸覆哑膜彩打,内部纸80g双胶纸黑白印刷,正反打印
2.装订方式:页码大于60需用胶装
3.未注尺寸公差按 +- 1.5mm
4.图面、字体印刷清晰、无毛边、不起边、油墨不脱落
5.字体颜色为PANTONE Black C,无边框,底色为白色
6.符合RoHS要求
143mm
Triple Power BMS Parallel Box-
G2
User Manual
EN
说明书 BMS Parallel Box-Ⅱ G2 英文版 SolaX 01
品名
材料
料号
320101064101
单位
设计
郑安琪
审核
赵焱
NA
核准
施鑫淼
浙江艾罗网络能源技术股份有限公司
页次
2023/10/26
2023/10/26
2023/10/26

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the BMS Parallel Box-II G2 and is the answer not in the manual?

Questions and answers

Summary of Contents for SolaX Power BMS Parallel Box-II G2

  • Page 1 3.未注尺寸公差按 +- 1.5mm 审核 赵焱 2023/10/26 4.图面、字体印刷清晰、无毛边、不起边、油墨不脱落 2023/10/26 品名 材料 核准 施鑫淼 说明书 BMS Parallel Box-Ⅱ G2 英文版 SolaX 01版 5.字体颜色为PANTONE Black C,无边框,底色为白色 浙江艾罗网络能源技术股份有限公司 料号 料号 320101064101 320101064101 6.符合RoHS要求 SolaX Power Network Technology (Zhejiang) Co., Ltd. 浙江艾罗网络能源技术股份有限公司 单位 页次 单位 页次...
  • Page 2 No part of this document may be reproduced or transmitted in any form or by any Zhejiang Province, 310000 P.R. CHINA means without prior written consent of SolaX Power Technology (Zhejiang) Co., Ltd. Tel.: +86 (0) 571-5626 0011 (hereinafter referred to as SolaX). SolaX reserves the right of final interpretation.
  • Page 3 CHANGE HISTORY Changes between document versions are cumulative. The latest version contains all updates made in previous versions. Version 01 (Oct. 26, 2023) Updated all pictures that include the appearance and port details of the parallel box. Version 00 (Sept. 21, 2023) Initial release...
  • Page 4: Table Of Contents

    Contents TROUBLESHOOTING..................24 NOTE ON THIS MANUAL ................1 DECOMMISSIONING ..................26 1.1 SCOPE OF VALIDITY................1 7.1 DISMANTLING THE BOX ..............26 1.2 TARGET GROUP..................1 7.2 PACKAGING ..................26 1.3 SYMBOLS USED..................1 MAINTENANCE.....................27 SAFETY .....................2 WARRANTY ....................28 2.1 APPROPRIATE USAGE ................2 WARRANTY REGISTRATION FORM 2.2 IMPORTANT SAFETY INSTRUCTIONS..........3 2.3 QUALIFIED INSTALLER ................4 PRODUCTION INTRODUCTION ..............6 3.1 PRODUCTION OVERVIEW ..............6...
  • Page 5: Note On This Manual

    Notes on this Manual Note on this Manual 1.1 Scope of Validity This manual is an integral part of the Parallel Box Series. It describes the assembly, installation, commissioning, maintenance and failure of the product. Please read carefully prior to operation. Model: BMS Parallel Box- G2 Ⅱ...
  • Page 6: Safety

    Safety Safety Safety 2.2 Important Safety Instructions Appropriate Usage DANGER! For safety reasons, installers are responsible for familiarizing themselves with the contents of this manual and all warnings before performing installation. Danger to life due to high voltages in the parallel box! All work must be carried out by qualified electrician.
  • Page 7: Qualified Installer

    Safety Safety Explanation of Symbols Prior to the application, please read this section carefully to ensure correct and • safe application. This section gives an explanation of all the symbols shown on the warning label. Please keep the user manual properly. •...
  • Page 8: Dimensions

    Product Introduction Product Introduction Product Introduction 3.1.2 Appearance Product Overview Ⅱ Ÿ Terminals of the BMS Parallel Box- For safety reasons, installers are responsible for familiarizing themselves with the Bottom view: Right side view: contents of this manual and all warnings before performing installation. XIII 3.1.1 Dimension...
  • Page 9: Basic Features

    41.4 11.5 16.1 Technical Data Nominal System two Operating Total capacity Usable capacity Nominal Max power Model BMS Parallel Box-II G2 voltage [V] voltage [V] power [kW] [kW] (T-BAT-SYS-HV-3.0) [kWh] [kWh] Dimension (W/H/D)(in/mm) 14.48*13.15*6.04/368*334*153.5 T-BAT S 3.0 G2 102.4 90-116 Dimension of Packing (W/H/D)(in/mm) 17.32*15.63*10.12/440*397*257...
  • Page 10: Installation

    Installation Installation Installation 4.3 Tools Installation Prerequisites The following tools are required to install the box. When assembling the system, avoid touching the terminal with any metal objects or bare hands. The box provides a safe source of electrical energy when operated as designed.
  • Page 11: Accessories

    Installation Installation 4.4.3 Accessories 4.4.4 Mounting Steps ①For use with T-BAT-SYS-HV-5.8 Wall Mounting: Step 1: Fix the wall bracket on the wall • The bracket needs to be removed from the box. Measure it and mark the position of the two holes. The bubble of the spirit level should be centered. The height difference from battery modules to here should be >50cm.
  • Page 12: Overall Installation

    Installation Installation ② Connect with T-BAT-SYS-HV-3.0 Overall Installation Connect with a MC0600 (BMS) Depending on the connection with different battery systems, there are two parallel and 4 HV10230 battery modules: Connect with a MC0600 (BMS) options, with details as follows: inverter ①...
  • Page 13: Cable Connection

    Installation Installation * If the connector of the T-BAT-SYS-HV-3.0 controller does not match the NOTE! connector provided with the accessory cable, you can trim the blue connector The recommended installation distance between the box and the battery group and replace it with a black connector. The replacement should follow the rule (including slave group and master group) is 11.81-23.62 inches /300-600 mm, of male-to-male and female-to-female connections.
  • Page 14: Connecting Battery Modules

    Installation Installation ②For BMS Parallel box- 4.6.2 Connecting Battery Modules Ⅱ G2 + MC0600 + 2/4/6/8 HV10230 battery modules ①For BMS Parallel box- Ⅱ Ⅱ G2 + T-BAT H 5.8 + 1/3/5/7 HV11550 battery pack(s) From BMS Parallel box- G2 to T-BAT-SYS-HV-3.0: Main "BAT+"...
  • Page 15: Connecting Communication Cables

    Commissioning Installation NOTE! 4.6.3 Connecting Communication Cables When BMS Parallel box- Ⅱ G2 is connected to T-BAT-SYS-HV-5.8 battery 1) There is a protection cover for the RS485 connector. Unscrew the cover and plug modules, if master group's CAN is connected to slave group's CAN port, it can one end of the RS485 I communication cable to the RS485 I connector.
  • Page 16: Commissioning

    The LED indicators on the front panel of the BMS and the battery modules indicate groups must be the same. The second group of BMS Parallel box-II G2 must Capacity the operating status.
  • Page 17: Troubleshooting

    Troubleshooting Troubleshooting Troubleshooting Warning Messages Description Troubleshooting Check the indicators on the front to determine the state of the box. Battery over Wait until the temperature of the A warning state is triggered when a condition, such as voltage ortemperature, is BMS_TemHigh temperature cells returns to the normal state.
  • Page 18: Decommissioning

    Decommissioning Maintenance Decommissioning Maintenance Dismantling the Box If the ambient temperature for storage is 86°F~122°F/30℃~50℃, recharge • To shut down the system and dismantling the box, please follow the steps below: the batteries at least one time every 6 months. •...
  • Page 19: Warranty

    Warranty Warranty Registration Form Warranty For Customer (Compulsory) Triple Power protects this product under warranty when it is installed and used as listed in this manual. Country Name Violation of the installation procedure or use of the product in any way not described Phone Number Email in this manual will immediately void all warranties on the product.
  • Page 20 PLEASE REGISTER THE WARRANTY IMMEDIATELY AFTER INSTALLATION! GET YOUR WARRANTY CERTIFICATE FROM SOLAX! KEEP YOUR INVERTER ONLINE & WIN SOLAX POINTS! Open your Wait for the camera app camera to and point recognize your device the QR code at the QR code Notification Click the notification banner...

This manual is also suitable for:

Triple power bms parallel box-ii g2

Table of Contents