Storz UG Series Assembly Instructions Manual
Storz UG Series Assembly Instructions Manual

Storz UG Series Assembly Instructions Manual

Equipment cart

Advertisement

Quick Links

Equipment Cart
UGxxx
Assembly Instructions

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the UG Series and is the answer not in the manual?

Questions and answers

Summary of Contents for Storz UG Series

  • Page 1 Equipment Cart UGxxx Assembly Instructions...
  • Page 2 © All product pictures, photos and descriptions and texts are the intellectual property of KARL STORZ SE & Co. KG. Their use for other purposes and reproduction by third parties require the express approval of KARL STORZ SE & Co. KG. All rights reserved. 96206915EN – 10.19 / V1.2...
  • Page 3: Table Of Contents

    Equipment Cart UGxxx Contents Section Title Page General information ....................Warranty ........................Maintenance and repair ..................Reservation of rights ....................Scope of delivery ....................Assembly ........................ Tools and accessories required ................Mounting the basic equipment ................2.2.1. Mounting the beams on the base module .............. 2.2.2.
  • Page 5: General Information

    UGxxx 0. General information Thank you for your expression of confidence in the KARL STORZ brand name. Like all of our other products, this product is the result of years of experience and great care in manufacture. You and your organization have decided in favor of a modern, high quality piece of equipment from KARL STORZ.
  • Page 6: Maintenance And Repair

    Reservation of rights This documentation is the sole intellectual property of KARL STORZ and may not be copied or transmitted to third parties without the express written approval and consent of KARL STORZ.
  • Page 7: Scope Of Delivery

    Equipment Cart UGxxx 1. Scope of delivery Basic equipment Base module Beam package (lateral beams/energy beam) Cover Drawer unit Shelf Assembly set 10.19 / V1.2...
  • Page 8 Equipment Cart UGxxx Optional Isolation transformer Earth leakage monitor Monitor holder Monitor holding arm, long Monitor holding arm, short Monitor swivel arm Camera holder Camera holder for device rail 10.19 / V1.2...
  • Page 9 Equipment Cart UGxxx Bottle stand, large Bottle stand, small IV Pole IV Pole, height adjustable Device rail Support element Cable winder Keyboard tray 10.19 / V1.2...
  • Page 11: Assembly

    Equipment Cart UGxxx 2. Assembly NotE: Details of the assembly of the COR equipment cart series as well as the description of how devices are to be correctly positioned and connected on the cart can also be found in the assembly video (www.karlstorz.com). 10.19 / V1.2...
  • Page 12: Tools And Accessories Required

    Equipment Cart UGxxx 2.1 Tools and accessories required Allen key 5 mm (included in scope of supply) Allen key 4 mm (included in scope of supply) Crosspoint screwdriver, size 2 Cable tie etc. (included in scope of supply) 10.19 / V1.2...
  • Page 13: Mounting The Basic Equipment

    Equipment Cart UGxxx 2.2 Mounting the basic equipment 2.2.1. Mounting the beams on the base module Place the energy beam on the base plate by positioning the screws in the larger recesses of the elongated holes. Turn the beam in position, the screws are guided into the elongated holes in the process.
  • Page 14: Mounting The Cover

    Equipment Cart UGxxx 2.2.2. Mounting the cover Place the covers on the uprights by positioning the screws in the larger recesses of the elongated holes. Push the screws of the beams into position. 2.2.3. Mounting the drawer/shelves Place the drawer unit on the base plate and insert the holders from the rear in the grid bars on the beams.
  • Page 15: Connecting The Cables

    Equipment Cart UGxxx Proceed in the same manner when mounting the shelves. Firmly tighten the screws which secure the beams on the cover. (Allen key 5 mm) Then firmly tighten the screws which secure the beams on the base module. (Allen key 5 mm) 2.2.4.
  • Page 16 Equipment Cart UGxxx Route the supply line of the equipment cart from below through the recess in the cover intended for this purpose ..in the energy beam. Connect the cable to the distribution board. Connect the cable to the external power supply by inserting the power cord in the distribution board from below.
  • Page 17: Mounting Optional Accessories

    Equipment Cart UGxxx Mount the cover of the grid bars; cut it to the required length plus 5 mm. 2.3 Mounting optional accessories 2.3.1. Mounting the isolation transformer Slide the isolation transformer from the rear along the guide rails under the base plate. Route the power cord of the isolation transformer from above through the recess intended for this purpose in the energy beam.
  • Page 18 Equipment Cart UGxxx Undo the cable connection of the equipment cart supply line on the distribution board and route the supply line through the recess intended for this purpose to the isolation transformer. Remove the bridge on the isolation transformer. Attach the bridge to the distribution board.
  • Page 19: Mounting The Earth Leakage Monitor

    Equipment Cart UGxxx Only power supply socket outlet via main switch Route the external power supply through the recess to the isolation transformer. Connect the external power supply to the isolation transformer. Undo the cable of the external power supply on the distribution board..and instead connect the power cord of the isolation transformer.
  • Page 20: Mounting Attachments

    Equipment Cart UGxxx Mount the earth leakage monitor on the lateral beam by inserting the holder in the grid bars from the rear and pressing it down until it locks into place. Route the supply line of the earth leakage monitor from below through the recess intended for this purpose in the cover through the energy beam and to the isolation transformer.
  • Page 21: Mounting The Monitor Holding Arms

    Equipment Cart UGxxx Tighten the screw to secure the attachment in the grid bars. (Allen key 4 mm) Slide the plastic cover over the holder until it locks into place. 2.3.4. Mounting the monitor holding arms CAutIoN: If necessary, use counterweight plates to maintain the stability of the equipment cart. Check that the equipment cart cannot tilt over when operating without an isolation transformer. Remove the lid on the casing where you would like to mount the monitor holding arm.
  • Page 22: Component Layout Of The Equipment Cart

    Equipment Cart UGxxx Route the monitor cable ..through the cable channel of the holding arm. Attach the cover of the cable channel. To connect the cables for the monitor, remove the service lid and route the cable from below through the recess intended for this purpose in the cover in the energy beam.
  • Page 23: Co Bottle Holder, Universal For Small And Big Bottles

    Equipment Cart UGxxx 2.5 CO bottle holder, universal for small and big bottles UG609 If you want to use a small gas bottle - Remove the two marked screws using an Allen key. Remove the large plate from the small one. 10.19 / V1.2...
  • Page 24: Mounting Instruction For Co 2 Twin Bottle Holder

    Equipment Cart UGxxx 2.6 Mounting instruction for CO twin bottle holder UG627 Insert the sliding block with spring in the groove of the beam. Place the sliding blocks. Screw the bottle holder on the plate and screw the plate on the beam. Insert the sliding block with spring for the strap holder in the groove of the beam.
  • Page 25 Equipment Cart UGxxx Attach the plate to the beam. The plates must be positioned as needed and screwed tightly. 10.19 / V1.2...
  • Page 28 KARL STORZ SE & Co. KG Dr.-Karl-Storz-Straße 34 78532 Tuttlingen PO Box 230 78503 Tuttlingen Germany Tel.: +49 (0)7461 708-0 Fax: +49 (0)7461 708-105 E-mail: info@karlstorz.com Web: www.karlstorz.com...

Table of Contents