We want to know if you have any problems with our products. • Release hydraulic pressure before loosening any fittings. If you are missing any parts or find any damage, call Arcan directly, • Maintain proper hydraulic fluid levels. and we will remedy the situation. Please do not call the store where •...
Hex Head Bolts - 10 Bearing Shield - 1 Accessory only - Not needed for assembly 1/2" Nuts - 10 TOOLS NEEDED Washers - 10 3/4" and 1/2" sockets and wrenches Examine box contents, then proceed with the following instructions. CP400 Operation Manual...
Page 4
Wear safety gloves and safety goggles. Note: Position press feet on each side of the press. Attach one bolt, washer and nut on each side. Bolts should be attached OFFSET from one another. Front view CP400 Operation Manual...
Page 5
Front view WARNING Note: When sliding bed to frame Bed must be at the BOTTOM of the frame bottom, DO NOT use bed handles. before proceeding to the next step. Slide bed down to bottom of frame CP400 Operation Manual...
Page 6
ALL FOUR (4) pins must be COMPLETELY through BOTH SIDES of frame in order to operate press. Let bed rest on inserted pins Place 3rd and 4th pin on each side Secure pins completely through bed and frame. CP400 Operation Manual...
Page 7
Attach bolts to opposite corners first. Hand tighten. Wrench tighten after all four bolts have been tightened. This end up Inside of press frame, looking up Top of press frame, looking down CP400 Operation Manual...
Page 8
PRESSURE CRADLE. Pump ram Ram will retract as against press plates until gauge against press plates until gauge Do not allow the ram to pressure is released. reads "5 Tons". reads "10 Tons". extend more than 5.5". CP400 Operation Manual...
Need help?
Do you have a question about the CP400 and is the answer not in the manual?
Questions and answers