Installation
Unpacking and Inspection
Before installation, please inspect the unit. Be sure that nothing inside the pack-
age is damaged. You should have received the following items inside of pack-
age:
Preparation
Before connecting all please take off bottom cover by removing two screws as
shown below.
Mounting the Unit
Consider the following points before selecting where to install:
Do not mount the inverter on flammable construction materials.
Mount on a solid surface
Install this inverter at eye level in order to allow the LCD display to be read at all
times.
For proper air circulation to dissipate heat, reserve a clearance of 20 cm to the
side and 50 cm above and below the unit.
-5-
Need help?
Do you have a question about the GA1012P and is the answer not in the manual?
Questions and answers