Huawei EMMA-A01 User Manual page 19

Hide thumbs Also See for EMMA-A01:
Table of Contents

Advertisement

EMMA-(A01, A02)
User Manual
Figure 2-2 Networking diagram (using the EMMA-A02 as an example)
(A) Power load
(D) Charger
(G) FusionSolar app
(J) PV string
The networking is described as follows:
Issue 01 (2023-09-15)
EMMA-A01: Only PV and ESS features are supported. Plant-level power
control functions, such as maximum self-consumption and grid-tied point
control, are supported for unified scheduling of home energy and plant-level
energy optimization, further improving the PV energy utilization.
EMMA-A02: Features of PV, ESSs, smart chargers, and smart loads are
supported. In addition to unified scheduling of home energy, the EMMA-A02
can connect to smart loads such as chargers, SG Ready heat pumps, and
smart switches. Users can set the reservation time to charge vehicles and
heat water in advance at the specified time. In addition, users can set the
priority to use PV energy for devices as required to make the best use of PV
energy.
The preceding figure uses the EMMA-A02 as an example. The EMMA-A01
cannot connect to smart electrical devices such as chargers, SG Ready heat
pumps, and smart switches.
Inverters connect to the EMMA over RS485. A maximum of three inverters can
be connected in parallel.
The EMMA is connected to the router through the FE or WLAN port.
Copyright © Huawei Digital Power Technologies Co., Ltd.
(B) Smart switch
(E) Router
(H) Power grid
(K) Inverter
2 Product Description
(C) SG Ready heat pump
(F) FusionSolar Smart PV
Management System
(SmartPVMS)
(I) ESS
(L) EMMA
13

Advertisement

Table of Contents
loading

This manual is also suitable for:

Emma-a02

Table of Contents