Page 1
To improve health and wellness by actively restoring indoor air Save this Document to its pure, natural state where no pollution or contaminants for future Reference & AtmosAir.com exist,while reducing energy use and emmisions in the process. Warranty Information CAG-04-19-001...
Page 2
Installation, Operation & Maintenance Guide Matterhorn 1000/1002 Series !IMPORTANT! READ THIS BEFORE STARTING INSTALLATION. DO NOT THROW AWAY THIS GUIDE. For safe installation you MUST: ■ Always disconnect power to the unit before handling any of the components. ■ Secondary voltage to the ionization tube can be as high as 3000 volts AC.
Installation, Operation & Maintenance Guide Matterhorn 1000/1002 Series 02 INSTALLATION Mechanical Installation AtmosAir 1000 series equipment can be mounted in a duct or 1. Carefully remove the equipment from its shipping air handler wall, using the faceplate mounting 昀氀ange and its container.
Installation, Operation & Maintenance Guide Matterhorn 1000/1002 Series 6. Using the marked holes from the backer-plate template, af昀椀x the unit securely in the duct using self-tapping screws (if not using backer-plate). Do not over-tighten, this may strip the screw hole. The unit is self-sealing to the duct so no further sealing is needed.
■ Field-install a power plug outlet or junction box within 8 feet (2.5m) of the unit(s). ■ Each Matterhorn 1000/1002 series unit is typically shipped with a 10-foot power cord with a C13 connector on one end and a 3-prong NEMA 5-15 plug on the other end. The plug can...
Installation, Operation & Maintenance Guide Matterhorn 1000/1002 Series 03 OPERATION 04 MAINTENANCE REQUIREMENTS Once the system is properly installed and ALL PERSONNEL ARE CLEAR of the high voltage tubes, the system can The maintenance requirements on an AtmosAir system are be turned on: mainly site-dependent;...
Installation, Operation & Maintenance Guide Matterhorn 1000/1002 Series 05 TROUBLESHOOTING 7. If physical inspection has not revealed the cause of failure, one may carefully observe the tubes as the ionization system is turned on to determine whether In the event that the system is not functioning, follow these arcing is occurring at a particular tube.
AtmosAir Matterhorn 1000/1002 Equipment Above: Matterhorn 1002 Ionization Above: Matterhorn 1000 Ionization unit. Here you will see there is 1 Ionization unit. Here you will see there Tube installed towards the center of the device (This should always be installed are 2 Ionization Tubes installed with the tube closest to the center of the unit).
Installation, Operation & Maintenance Guide Matterhorn 1000/1002 Series 07 MORE SOLUTIONS Commercial solutions start with the 500 series, available in Portable systems, such as the Rainier R1 (above), are an two sizes: the 500FC (Not pictured) and the 508FC (pictured alternative solution for small spaces where use of the existing above).
Need help?
Do you have a question about the Matterhorn 1000 and is the answer not in the manual?
Questions and answers