Section 3: First-Time Set-Up Requirements - Craftsman 220 User Manual

Metal fold-up utility trailer
Hide thumbs Also See for 220:
Table of Contents

Advertisement

FIRST-TIMe SeT-UP ReqUIReMeNTS
lug Nuts: Tightening Sequence, Torque Requirements
• Before unfolding your Trailer, remove the plastic Zip Tie holding the Locking Pin
to the Tongue of the Trailer. Do not cut the Lanyard.
Lug nuts are prone to loosen after initial installation possibly causing
the wheel to separate from the trailer leading to property damage, death
or serious injury.
• Check lug nuts for tightness on a new trailer or when wheel(s) have
been remounted after the first 10, 25 and 50 miles of driving and
after any impact.
• Lug nuts for the tires must be tightened by the user before each use.
• Sears cannot be held responsible for damages caused by loosened
lug nuts.
• Before towing the Trailer, you must ensure the lug nuts are tightened to the proper
torque.
• The torque requirements for the lug Nuts are 95 - 120 ft./lb. Do not exceed 120
ft./lb of torque. Tighten the lug Nuts in the sequence below before you leave the
dealer.
Tighten lug nuts
in the following
order:
Verify the proper PSI for your tire.
• Tire pressure for the 12" rim & tire should be at 80 psi.
Follow local and state laws, but do not exceed 65 mph.
Before loading Trailer, Trailer must be properly connected to
the Tow Vehicle to stabilize the Trailer. Failure to follow this
warning could result in property damage, personal injury and
death.

SeCTIoN 3:
WARNING
3
5
WARNING
1
4
2
locking Pin
lanyard

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

123.24201

Table of Contents