Supplied Hardware List; Quincaillerie Fournie; Contenido De Hardware; Tools Required (Not Supplied) - OVE 0150560 Installation Manual

Shower enclosure
Table of Contents

Advertisement

AA
Screw
Vis
Tornillo
ST4x12mm
3+1
FF
Cap
Capuchon
Capuchón
3x
Pencil
Crayon
Lápiz
Measuring Tape
Ruban à mesurer
Cinta medidora

SUPPLIED HARDWARE LIST

QUINCAILLERIE FOURNIE

CONTENIDO DE HARDWARE

BB
Screw
Vis
Tornillo
ST4x20mm
2+1
GG
Fitting
Raccord
Accesorio
3x

TOOLS REQUIRED (not supplied)

OUTILS REQUIS (non fournis)

HERRAMIENTAS NECESARIAS (no incluido)

Screwdriver
Tournevis
Destornillador
Level
Niveau
Nivel
Safety glasses
Lunettes de Sécurité
Anteojos de seguridad
CC
Screw
Vis
Tornillo
ST5x30mm
3+1
HH
Cap
Capuchon
Capuchón
4x
Drill and drill bits
Perceuse et forets
Taladro con brocas
ø1/8" (3mm) & ø5/16" (8mm)
Silicone
Silicone
Silicona
Ratchet
Clé à rochet
Llave de trinquete
5mm Bit socket
DD
Screw
Vis
Ancrage mural
Tornillo
ST5x40mm
2+1
II
Cap
Capuchon
Capuchón
2x
2mm & 2.5mm & 5mm
Maillet en caoutchouc
EE
Wall Anchor
Tarugo
ø8x30mm
5+1
Allen key
Clé Allen
Llave Allen
Cutter
Exacto
Cuchilla
Rubber mallet
Mazo de goma
PAGE 9

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the 0150560 and is the answer not in the manual?

Questions and answers

Brad Marshall
February 22, 2025

my wall track does not have holes for the screws that holde the fixed panel to the wall track. **** I supposed to drill these holes

1 comments:
Mr. Anderson
February 22, 2025

Yes, the OVE wall track 0150560 requires drilling holes for securing the fixed panel. The instructions specify marking the track hole positions, drilling pilot holes with a ø5/16” (8mm) drill bit, and inserting wall anchors if there are no studs before securing the track with screws.

This answer is automatically generated

This manual is also suitable for:

Sydney 608271230665843

Table of Contents