Commissioning

5
5.1

Inspection before Commissioning

Inspection item
No.
All cables are connected correctly and firmly.
1
The phase sequence of all cables is correct.
2
The internal and external grounding points of the device are reliably grounded.
3
5.2

Commissioning Steps

Commissioning Steps
Description
Item
1
Connect the internal fuse of COM100A.
Connect the control switch of AC power supply.
2
Check whether the switch and 24V switch-mode power supply operate normally.
3
Observe running indicators of Logger3000. If the PWR indicator keeps steady on,
4
and the RUN indicator flickers once every second, the device operates normally.
5
Connect the transformer-side circuit breaker.
Configure Logger3000 through WEB Interface
Description
Item
Connect PC to the Ethernet port of the switch inside COM100A by using a net-
1
work cable. IP of the Ethernet port is 13.13.13.13 by default.
Set IP of the PC, which should be in the same network segment as that of the
ETH2 port of the Logger3000. For example, it can be set to 13.13.13.x (x ranges
2
between 1 and 255, except 13), and the subnet mask can be set to
255.255.255.0.
Enter the IP of the Logger3000, such as 13.13.13.13, in the PC address bar, to
3
enter the corresponding Web interface.
4
Configure serial port parameters.
5
Add devices.
6
Configure device IP.
30