Erv (Energy Recovery Ventilation) Control - Mitsubishi Electric MVZ Series Service Manual

Hide thumbs Also See for MVZ Series:
Table of Contents

Advertisement

11

ERV (ENERGY RECOVERY VENTILATION) CONTROL

11-1. CONTROL SPECIFICATIONS
The below table shows how the field installed ERV is controlled.
ERV output
Condition
CNER input
OFF
Cool/Heat/Fan operation
Defrost
STOP
ON
Cool/Heat/Fan operation
Defrost
STOP
11-2. INSTALLATION
A basic connection method is shown below.
XF
ERV
On-site preparation
Maximum cable length is 10m(32ft)
Fan speed
RC setting
STOP
STOP
RC setting
STOP
Low
XB
XB
ERV switch
CN2C output
(=Fan output)
ON
OFF
OFF
ON
OFF
ON
Indoor unit
control board
CN2C
CNER
Use XB relay having following specifications
Rated voltage:12VDC
Power consumption:1W or less
ERV switch:Minimum applicable load 1mA at DC
Contact rating voltage:15VDC or more
Contact rating current:0.1A or more
23

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mvz-a12aa4Mvz-a18aa4Mvz-a24aa4Mvz-a30aa4Mvz-a36aa4

Table of Contents