Tool Shed TSPHB5 Manual

Tool Shed TSPHB5 Manual

Post hole borer 51cc with auger
Hide thumbs Also See for TSPHB5:

Advertisement

POST HOLE BORER 51CC
WITH AUGER
TSPHB5
www.thetoolshed.co.nz

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the TSPHB5 and is the answer not in the manual?

Questions and answers

Summary of Contents for Tool Shed TSPHB5

  • Page 1 POST HOLE BORER 51CC WITH AUGER TSPHB5 www.thetoolshed.co.nz...
  • Page 2: Table Of Contents

    OPERATION MANUAL TABLE OF CONTENTS PRODUCT DETAILS Product Details ToolShed Petrol Powered Post Hole Borer Product Model Specifications 51CC with 200mm Auger Product Identification Product Code TSPHB5 Safety Guidelines Assembly Operation Maintenance Storage Parts Diagram DISTRIBUTED BY: Thank You Note: For the purchase of this ToolShed product.
  • Page 3: Specifications

    OPERATION MANUAL OPERATION MANUAL SPECIFICATIONS PRODUCT IDENTIFICATION CC Rating 51.7 cc/rev Drive Shaft Capacity Up to 200mm Ø Maximum Engine Type 2-Stroke Single Cylinder Petrol Engine Fuel Tank Capacity 1.2 Litre Fuel Mixture 25:1 (Petrol:Oil) Gear Ratio 34:1 Machine Weight 10 KG Auger Weight 2 KG Note: 2-Stroke Oil mix only with a mix of 25-to-1 is to be used in this engine.
  • Page 4: Safety Guidelines

    OPERATION MANUAL OPERATION MANUAL SAFETY GUIDELINES SAFETY GUIDELINES Power Tool & Machinery Use & anything else that could be of risk, away from WARNING Care moving parts in the machine, or they could be caught therein. • Use the correct tool for the job. Forcing READ ALL SAFETY WARNINGS &...
  • Page 5 OPERATION MANUAL OPERATION MANUAL SAFETY GUIDELINES SAFETY GUIDELINES Fuel & Engine Safety Gasoline & Vapours When Adding or Removing When Starting the Engine Gasoline • • Engine exhaust contains carbon monoxide, a DO NOT attempt to start a damaged engine. •...
  • Page 6: Assembly

    OPERATION MANUAL OPERATION MANUAL SAFETY GUIDELINES ASSEMBLY • Post Hole Borer Specific Safety Fitting Auger Bits Before using your hole borer, always visually inspect it to see if any parts are worn or • • Before using the post hole borer, the operator Always ensure the post hole borer is switch off damaged.
  • Page 7: Operation

    OPERATION MANUAL OPERATION MANUAL OPERATION OPERATION • • • Filling the Fuel Tank If the carburettor requires priming, pump the When resistance is felt, pull the cord sharply. Remove any objects or debris that could be clear rubber priming button (4.1) until fuel thrown, jammed or become entangled in the Continue this procedure until the engine •...
  • Page 8: Maintenance

    OPERATION MANUAL OPERATION MANUAL MAINTENANCE STORAGE • • Spark Plug Before cleaning or performing any mainte- If the hole borer is not to be used for, or is to be WARNING nance, you must ensure the tool is switched stored for more than one month, the following •...
  • Page 9: Parts Diagram

    OPERATION MANUAL OPERATION MANUAL PARTS DIAGRAM PARTS DIAGRAM Drum Clutch Input Shaft Washer Bearing – 6202 x2 Input Axle Box Body Bearing – 6202 x2 Gasket Bevel Wheel Bevel Wheel Shaft Spur Gear Bearing – 16004 Screw – M6X15 Output Axle Box Body Shock Pad Flat Gasket x6 Spring Washer x6...

Table of Contents