E X T E R N A L B AT T E R Y M O D U L E F O R R T G 2 5 - 1 0 K VA U L
5

Battery Installation

If your battery pack is not installed with batteries, please follow the proper procedure
5-1
to put batteries inside of the unit
Step 1
5-2
Step 2
WARNING
A) Remove watches, rings or other metal objects.
B) Use tools with insulated handles
Step 1: Remove the topcover as below diagram.
5-1
Step 2: Remove the battery fixing plates from the bottom case as below diagram.
5-2
STATUS:
Approved
© Copyright 2022 ABB. All rights reserved.
MAKE SURE THAT THE BATTERY PACK IS DISCONNECTED FROM THE UPS
BEFORE PERFORMING THE FOLLOWING SEQUENCE OF OPERATIONS.
NOTE
THE EQUIPMENT SHOULD BE INSTALLED BY SERVICE PERSONNEL
WHEN INSTALLING THE BATTERIES, USE THE SAME NUMBER AND
TYPE OF BATTERIES SHOWN IN THE BATTERY LABEL
DO NOT OPEN OR MUTILATE THE BATTERY OR BATTERIES,
RELEASED ELECTROLYTE IS HARMFUL TO THE SKIN AND EYES
A BATTERY CAN PRESENT A RISK OF ELECTRIC SHOCK AND HIGH
SHORT CIRCUIT CURRENT. THE FOLLOWING PRECAUTION SHOULD
BE OBSERVED WHEN WORKING ON BATTERIES