Husqvarna 2-20DT Global Operator's Manual page 18

Shot blasting machine
Hide thumbs Also See for 2-20DT Global:
Table of Contents

Advertisement

Available languages

Available languages

Turn the speed control dial clockwise to increase the
speed.
Turn the speed control dial counterclockwise to
decrease the speed.
a) Use drive speed 6–10 on concrete surfaces for
light treatment.
b) Use drive speed 0–5 on concrete surfaces for
heavy treatment.
c) Use drive speed 0–2 on steel surfaces.
To start the product
1. Connect the product to a power supply. Refer to
connect the product to a power source on page 17 .
2. Start the dust extractor. Refer to the operator's
manual of the dust extractor.
3. Attach the dust extractor hose to the product. Refer
To connect a dust extractor on page 17 .
to
4. Turn the emergency stop button clockwise to make
sure that the emergency stop button is disengaged.
5. Set the ON/OFF switch on the electrical enclosure in
the ON position.
 
 
18
6. Push the ON button to start the control panel.
 
To
 
7. Engage the drive system. Refer to
disengage the drive system on page 12 .
8. Push the ON button to start the blastmotors.
 
 
9. Wait until the ammeters are in idle position.
To engage and
2037 - 001 - 07.02.2023

Advertisement

Table of Contents
loading

This manual is also suitable for:

2-30ds global

Table of Contents